- 31activities with zero time duration are referred to as:
A.critical path activites.
B.noncritical path activities.
C.slack time activities.
D.dummies
E.none of above.
开始考试练习点击查看答案 - 32for a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". the total standard deviation for thischaracteristic is:
A.1.4"
B.1.2".
C.1.0"
D.0.8"
E.0.2"
开始考试练习点击查看答案 - 33project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:
A.overhead rates, labor rates and material costs.
B.overhead rates, schedule slippages, and rework.
C.rework, cost-of-living adjustments, and overtime.
D.material costs, shipping cost, and scope changes.
E.labor rates, material costs, and cost reporting.
开始考试练习点击查看答案 - 34selective perception is ( ) of new conflicting information that may result, in a breakdown in communication.
A.encoding
B.blocking out
C.transmission
D.acceptance
E.decoding
开始考试练习点击查看答案 - 35the work breakdown structure (wbs) is an excellent tool for objective control and evaluation. which of the following is generally notvalidated through the wbs、
A.time, schedule and cost.
B.management coordination and organization structuring.
C.work methods and accountability.
D.quality of work.
E.risk and impact decision-making.
开始考试练习点击查看答案 - 36when working in an environment that uses learning curves, the most effective plan for creating the perception that pay is related toperformance is to provide the team members with an individual salary plus bonus based upon
A.individual productivity
B.cost effectiveness
C.group or team productivity
D.rating system developed by the project manager
E.all of the above
开始考试练习点击查看答案 - 37which of the following is not part of the acquisition process:
A.source selection
B.invitation to bid
C.contract award
D.notice to proceed
E.all of the above are parts of the acquisition process.
开始考试练习点击查看答案 - 38an individual who is working on the satisfaction of physiological needs has essentially satisfied which needs、
A.safety
B.empowerment/authority
C.esteem
D.self-actualization
E.none of the above
开始考试练习点击查看答案 - 39in the pdm, common constraints include:
A.start-to-start
B.finish-to-start
C.finish-to-finish
D.b and c only
E.a, b, and c
开始考试练习点击查看答案 - 40scope reporting is the timely determination, ( ), and ( ) of project progress, status data, and transforming this into structureddocumentation (reports) necessary to judge project performance (reporting on work packages).
A.recording, accumulation.
B.recording, graphical display.
C.accumulation, graphical display.
D.graphical display, interpretation.
E.interpretation, analysis.
开始考试练习点击查看答案
最新试卷
高中教育高考语文(重庆卷)2013年普通高等学校招生全国统一考试
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题9
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题8
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题6
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题4
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题3
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题2
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题1
类别:学历类其它高中教育高考语文高中语文课课练(5)
类别:学历类其它高中教育高考语文高中语文总复习 经典易错题会诊与命题角度
类别:学历类其它