位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(19,20)

the future value of an annual income flow of $1000 for 2 years at 10% is:

发布时间:2024-07-09

A.2200

B.2280

C.2300

D.2310

E.none of the above

试卷相关题目

  • 1the core function of the project manager is

    A.systems design

    B.client interfacing

    C.quality assurance

    D.integration

    开始考试点击查看答案
  • 2the act of conducting or supervising the exchange of information is:

    A.consulting

    B.project management

    C.communications management

    D.communications enhancement

    E.none of the above

    开始考试点击查看答案
  • 3the quality risk (    ) .

    A.is minimized through continuous monitoring.

    B.is considered a long term risk.

    C.will be reflected in the in-service life of the project result.

    D.b and c

    E.all of the above.

    开始考试点击查看答案
  • 4on november 1, $1000 worth of work on task a was supposed to have been done (bcws); however, the bcwp was $850. calculate theschedule variance:

    A.-100

    B.100

    C.-150

    D.150

    E.0.85

    开始考试点击查看答案
  • 5going from level 2 to level 4 in the work breakdown structure will result in

    A.less estimating accuracy

    B.better control of the project

    C.lower status reporting costs

    D.a greater likelihood that something will fall through the cracks

    E.none of the above

    开始考试点击查看答案
  • 6the initial cost of a product and the product's operation and maintenance costs (    ) .

    A.increases perceived value when balanced.

    B.are incidental to each other because initial costs are "sunk"

    C.decreases design costs as operation periods increase

    D.B.are incidental to each other because initial costs are "sunk"C.decreases design costs as operation periods increaseD.provides perceived function value and product social dysfunction

    E.are integrally related with each other because initial costs are "sunk".

    开始考试点击查看答案
  • 7all of the following may hinder a person's ability to transmit/receive a message except:

    A.unfamiliarity with topic

    B.withholding information

    C.assuming

    D.noise

    E.preoccupation

    开始考试点击查看答案
  • 8quality improvement programs are normally associated with which two of the following、

    A.juran and crosby

    B.juran and deming

    C.crosby and deming

    D.deming and the japanese

    E.crosby and the japanese

    开始考试点击查看答案
  • 9the utility theory (    ) .

    A.considers risk propensity of the decision maker.

    B.attempts to formalize management's risk considerations.

    C.works well with decision tree analysis.

    D.is considered highly theoretical.

    E.all of the above.

    开始考试点击查看答案
  • 10the document authorizing functional areas to charge against the project is the:

    A.work authorization form

    B.scope baseline

    C.project charter

    D.management plan

    E.linear responsibility chart

    开始考试点击查看答案
返回顶部