the core function of the project manager is
A.systems design
B.client interfacing
C.quality assurance
D.integration
试卷相关题目
- 1the act of conducting or supervising the exchange of information is:
A.consulting
B.project management
C.communications management
D.communications enhancement
E.none of the above
开始考试点击查看答案 - 2the quality risk ( ) .
A.is minimized through continuous monitoring.
B.is considered a long term risk.
C.will be reflected in the in-service life of the project result.
D.b and c
E.all of the above.
开始考试点击查看答案 - 3on november 1, $1000 worth of work on task a was supposed to have been done (bcws); however, the bcwp was $850. calculate theschedule variance:
A.-100
B.100
C.-150
D.150
E.0.85
开始考试点击查看答案 - 4going from level 2 to level 4 in the work breakdown structure will result in
A.less estimating accuracy
B.better control of the project
C.lower status reporting costs
D.a greater likelihood that something will fall through the cracks
E.none of the above
开始考试点击查看答案 - 5the receiver filters messages based on all but the following:
A.language
B.distance
C.culture
D.knowledge
E.authority/reputation
开始考试点击查看答案 - 6the future value of an annual income flow of $1000 for 2 years at 10% is:
A.2200
B.2280
C.2300
D.2310
E.none of the above
开始考试点击查看答案 - 7the initial cost of a product and the product's operation and maintenance costs ( ) .
A.increases perceived value when balanced.
B.are incidental to each other because initial costs are "sunk"
C.decreases design costs as operation periods increase
D.B.are incidental to each other because initial costs are "sunk"C.decreases design costs as operation periods increaseD.provides perceived function value and product social dysfunction
E.are integrally related with each other because initial costs are "sunk".
开始考试点击查看答案 - 8all of the following may hinder a person's ability to transmit/receive a message except:
A.unfamiliarity with topic
B.withholding information
C.assuming
D.noise
E.preoccupation
开始考试点击查看答案 - 9quality improvement programs are normally associated with which two of the following、
A.juran and crosby
B.juran and deming
C.crosby and deming
D.deming and the japanese
E.crosby and the japanese
开始考试点击查看答案 - 10the utility theory ( ) .
A.considers risk propensity of the decision maker.
B.attempts to formalize management's risk considerations.
C.works well with decision tree analysis.
D.is considered highly theoretical.
E.all of the above.
开始考试点击查看答案
最新试卷
房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它