位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(19,20)

the receiver filters messages based on all but the following:

发布时间:2024-07-09

A.language

B.distance

C.culture

D.knowledge

E.authority/reputation

试卷相关题目

  • 1the net present value of $110 one year from now at 10% is:

    A.100

    B.120

    C.121

    D.$100 less taxes

    E.$100 less taxes and interest

    开始考试点击查看答案
  • 2situations calling for a matrix organization include outside pressure for dual focus, (    ) andpressure for high information processingcapability.

    A.pressure for clear accountability

    B.pressure for reduced duplication of effort

    C.pressure for shared resources

    D.pressure for formalized communication

    开始考试点击查看答案
  • 3quality control is normally performed by the (    ) .

    A.qa personnel

    B.project team

    C.operating personnel

    D.project management

    E.none of the above.

    开始考试点击查看答案
  • 4graphical displays of accumulated cost and labor hours, plotted as a function of time, are called:

    A.variance reports

    B.s curves

    C.trend analysis

    D.earned value reporting

    E.baseline control

    开始考试点击查看答案
  • 5a warranty may not be a remedy for products delivered unfit when (    ) .

    A.the pm has knowledge of the product, inspected it without relying on the seller's skill

    B.the products delivered comply with the plans and specifications of the client

    C.the plans and specifications produced by the seller match the completed product.

    D.a and b

    E.none of the above.

    开始考试点击查看答案
  • 6going from level 2 to level 4 in the work breakdown structure will result in

    A.less estimating accuracy

    B.better control of the project

    C.lower status reporting costs

    D.a greater likelihood that something will fall through the cracks

    E.none of the above

    开始考试点击查看答案
  • 7on november 1, $1000 worth of work on task a was supposed to have been done (bcws); however, the bcwp was $850. calculate theschedule variance:

    A.-100

    B.100

    C.-150

    D.150

    E.0.85

    开始考试点击查看答案
  • 8the quality risk (    ) .

    A.is minimized through continuous monitoring.

    B.is considered a long term risk.

    C.will be reflected in the in-service life of the project result.

    D.b and c

    E.all of the above.

    开始考试点击查看答案
  • 9the act of conducting or supervising the exchange of information is:

    A.consulting

    B.project management

    C.communications management

    D.communications enhancement

    E.none of the above

    开始考试点击查看答案
  • 10the core function of the project manager is

    A.systems design

    B.client interfacing

    C.quality assurance

    D.integration

    开始考试点击查看答案