位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(9,10)

a project manager who allows the team to make the majority of the decisions is demonstrating a(n) (    ) leadership style.

发布时间:2024-07-09

A.laissez-faire

B.boss-centered

C.subordinate centered

D.autocratic

E.demographic

一对一服务

  • 报班培训

    电网、中烟、专升本
    线下培训
  • 网课学习

    各种网络课程
    学习辅导
  • 免费资料

    免费资料
    一对一辅导
  • 老师解答

    题目不会做
    一对一辅导

试卷相关题目

  • 1a contractor estimates that a project has a 0.5 probability of $200,000 profit and 0.3 probability of $50,000 loss. the expected monetary value of this project is:

    A.200000

    B.150000

    C.85000

    D.50000

    E.none of the above.

    开始考试点击查看答案
  • 2which of the following types of contracts allows the owner to transfer risk to the contractor:

    A.cost plus incentive fee

    B.cost sharing

    C.firm fixed price

    D.cost plus fixed fee

    E.performance guarantees

    开始考试点击查看答案
  • 3which of the following is least likely to be used in explaining to a team member why you consider his/her performance substandard、

    A.project office memo

    B.counseling session

    C.project team meeting

    D.formal letter

    E.individual conversation

    开始考试点击查看答案
  • 4which of the following diagrams is most useful in impact analysis:

    A.arrow diagrams

    B.precedence diagrams

    C.decision trees

    D.pareto diagrams

    E.cause and effects diagrams

    开始考试点击查看答案
  • 5the majority of product defects could be prevented in most processes if manufactures would do the following:

    A.increase the use of acceptance control charts instead of standard three-sigma control charts.

    B.make a concerted effort to eliminate the potential for product defects in the design stage.

    C.create a quality control department.

    D.a and b

    E.a and c

    开始考试点击查看答案
  • 6historical records during close-out are useful to (    ) and (    ) for future projects.

    A.predict trends, highlight problems.

    B.analyze successes, shortfalls.

    C.analyze strengths, document results.

    D.support litigation, defend claims.

    E.justify results, set standards.

    开始考试点击查看答案
  • 7in a fishbone diagram, the effect you are concerned about is placed:

    A.at the right-hand end of the spine.

    B.at the end of the diagonal line (i.e. "fin").

    C.on a branch of a fin.

    D.at the left-hand end of the spin

    E.E.none of the above.

    开始考试点击查看答案
  • 8sound, prudent, but often unsophisticated judgement is called:

    A.common sense

    B.rational management

    C.smoothing

    D.confrontation

    E.none of the above

    开始考试点击查看答案
  • 9which of the following types of specifications gives measurable capabilities of the product:

    A.functional specifications

    B.performance specifications

    C.conformance specifications

    D.technical specifications

    E.process capability specification

    开始考试点击查看答案
  • 10a graphical display of accumulated costs and labor hours for both budgeted and actual costs, plotted against time, is called a(n) (    ).

    A.trend line.

    B.trend analysis.

    C.s curve.

    D.percent completion report.

    E.earned value report.

    开始考试点击查看答案
X
返回顶部