位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(21,22)

手机扫码关注微信
随时随地刷题

项目管理师PMP美国项目管理PMPPMP认证考试练习题(21,22)

推荐等级:
  • 卷面总分:0分
  • 试卷类型:模拟试题
  • 测试费用:¥5.00
  • 试卷答案:
  • 练习次数:0
  • 作答时间:0分钟

试卷介绍

试卷预览

  • 11in communications management, to assimilate through the mind or senses (as in new ideas) is the process of

    A.understanding

    B.communicating

    C.receiving

    D.decoding

    E.comprehending

    开始考试练习点击查看答案
  • 12in general, the best long-lasting approach to settling project conflict is the (    ) approach .

    A.problem solving

    B.compromise

    C.withdrawal

    D.smoothing

    E.forcing

    开始考试练习点击查看答案
  • 13in which of the following cost estimating techniques are statistics models used:

    A.nonparametric cost estimating

    B.parametric cost estimating

    C.life cycle cost estimating

    D.bottom-up estimating

    E.all of the above.

    开始考试练习点击查看答案
  • 14the (    ) specification delineates specific end use capabilities which can be tested in the acceptance procedure.

    A.performance

    B.functional

    C.technical

    D.base line

    E.operational

    开始考试练习点击查看答案
  • 15the contractual statement of work (csow)

    A.must be the same as the proposal statement of work

    B.does not identify reporting requirements

    C.can be at a different level of detail (i.e. wbs level) than the proposal statement of work

    D.identifies the contractor's organizational structure for the project

    E.all of the above

    开始考试练习点击查看答案
  • 16the key ingredient to a successful quality management program are (    ).

    A.management's quality philosophy, operational quality assurance and operational quality control.

    B.quality evaluation methods and functional quality integrators.

    C.technical quality administration, the technical quality specifications, and the quality process review.

    D.quality evaluation methods, quality progress reviews and the technical quality specifications.

    E.all of the above.

    开始考试练习点击查看答案
  • 17the key purpose of project control is to:

    A.plan ahead for uncertainties.

    B.generate status reports.

    C.keep the project on track.

    D.develop the project road map.

    E.all of the above.

    开始考试练习点击查看答案
  • 18cip embodies which of the following principals、

    A.constancy of purpose

    B.customer focus and involvement

    C.total involvement

    D.teamwork

    E.all of the above.

    开始考试练习点击查看答案
  • 19excessive flexibility in specifying requirements will (    ) the likelihood of time overruns.

    A.reduce.

    B.eliminate.

    C.double

    D.increase

    E.not affect

    开始考试练习点击查看答案
  • 20listening involves more than hearing sounds. the good listener

    A.repeats some of the things said

    B.finishes the speaker's sentences

    C.writes everything down

    D.nods his head frequently

    开始考试练习点击查看答案
 2/4   首页 上一页 1 2 3 4 下一页 尾页
返回顶部