to determine whether or not the employee correctly understands the message, the project manager needs to:
A.reduce the filtering
B.eliminate barriers
C.obtain feedback
D.use more than one medium
E.use all of the above.
试卷相关题目
- 1the project manager must be concerned with building a closely knit team. during the project kickoff meeting, the project manager can get agood start at team building by providing the team with:
A.proposed salary increases if the project is successful
B.bonuses for early completion date
C.a promise of future assignments
D.well-defined project objectives
E.linear responsibility charts
开始考试点击查看答案 - 2the budget associated with scope changes that have been approved but not planned for yet, is referred to a(n) ( ) budget.
A.unauditable.
B.undistributed.
C.preauthorize
D.C.preauthorized.D.contingency.
E.in-process.
开始考试点击查看答案 - 3researching, organizing and recording pertinent information is called:
A.alternative analysis
B.information gathering
C.configuration management
D.post project analysis
E.all of the above
开始考试点击查看答案 - 4in project risk management, risk response may include actions to:
A.reduce the probability of risk events
B.change the scope, budget, schedule or quality specifications of the project
C.reduce the consequences or severity of impacts of a potential risk event
D.a and c
E.all of the above.
开始考试点击查看答案 - 5a line manager provides you with three estimates for his activity in your pert network. his estimates are 2 weeks optimistically, 4 weeksmost likely, and 12 weeks pessimistically. the expected time which would appear on the chart would be:
A.4 weeks
B.5 weeks
C.6 weeks
D.7 weeks
E.none of the above.
开始考试点击查看答案 - 6what is the relative priority of project cost, schedule and quality、
A.1)cost - 2)schedule - 3)quality
B.1)quality - 2)schedule - 3)cost
C.1)quality - 2)cost - 3)schedule
D.1)schedule - 2)quality - 3)cost
E.all are of equal priority
开始考试点击查看答案 - 7( ) is a method of procurement where a contract results from a bid which may be changed through bargaining.
A.acquisition
B.contract negotiation
C.procurement
D.purchase negotiation
E.none of the above.
开始考试点击查看答案 - 8a proven effective means to insure quality conformance is to:
A.delegate accountability to subordinates
B.revise quality specifications to match quality measurements
C.train workers in proper quality methods
D.inspect quality into the product
E.make quality a higher priority than cost or schedule
开始考试点击查看答案 - 9communication management is best described as conducting or supervising
A.the way we listen
B.the way we speak
C.the way we feel
D.the exchange of information
E.perfect documentation activities
开始考试点击查看答案 - 10good project objectives must be:
A.general rather than specific
B.established without considering resource bounds
C.realistic and attainable
D.overly complex
E.measurable, intangible and verifiable
开始考试点击查看答案
最新试卷
房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它