位置:首页 > 题库频道 > 其它分类 > 计算机其它 > Oracle认证Oracle认证Oracle认证PA-CO

You create alternative CO versions for your controlling area, in addition to version 0. Whatwould you use additional CO versions for、 Note: There are 2 correct answers to this question.

发布时间:2024-07-09

A.To store data of alternative plan costing runs

B.To store different plan data

C.To store data of parallel valuation

D.To store different budget data

试卷相关题目

  • 1What master data objects can you set up using time-based fields、 Note: There are 2 correct answers to this question.

    A.Cost centers

    B.Statistical key figures

    C.Activity type

    D.Cost element

    开始考试点击查看答案
  • 2You are creating new activity type and want to maintain plan prices for a cost center. Whichattribute must you configure in the activity type master record、 Note: There are 3 correct answers tothis question.

    A.CO version

    B.Valid cost center categories

    C.Company code

    D.Price indicator

    E.Activity type category

    开始考试点击查看答案
  • 3You want to create cost centers for your company. What is the prerequisite to build an organizational structure for overhead cost controlling、

    A.Person responsible

    B.Profit center

    C.Standard hierarchy top node

    D.Cost center categories

    开始考试点击查看答案
  • 4You want to determine which operations of the routing should be considered in a productcost calculation.How do you do this、 Note: There are 2 correct answers to this question.

    A.By marking the cost indicator in the control key assigned to the operation

    B.By marking the Relevance to Costing indicator in the operation

    C.By assigning a cost center to the work center in the operation

    D.By defining a usage key in the header of the routing.

    开始考试点击查看答案
  • 5You want to create a new standard cost estimate based on the quantity structure of theexisting standard cost estimate. Which object do you use、(A). Costing type(B). Reference variant(C). Transfer control(D). Costing version

    A.Costing type

    B.Reference variant

    C.Transfer control

    D.Costing version

    开始考试点击查看答案
  • 6Which type of Profitability Analysis updates the cost of goods sold at the time of delivery、

    A.Periodic-accounting based

    B.Both account-based and costing-based

    C.Account-based only

    D.Costing-based only

    开始考试点击查看答案
  • 7What are some of the characteristics of planning for internal orders、 Note: There are 2correct answers to this question.

    A.You can plan multiple versions.

    B.You can enter costs and revenues.

    C.You can define tolerance limits for plan overspen

    D.D.Availability control can check against plan values.

    开始考试点击查看答案
  • 8Which of the following statements best describe Product Cost by Order、 Note: There are 2correct answers to this question.

    A.It is used when you perform repetitive manufacturing.

    B.It is recommended for products with a long production time.

    C.It is used when full cost traceability is neede

    D.D.It is used when controlling by individual production lots or discrete quantities is needed.

    开始考试点击查看答案
  • 9At what level do you create the structure of the operating concern、

    A.Sales organization level

    B.Controlling area level

    C.Client level

    D.Company code level

    开始考试点击查看答案
  • 10In which module do you process profit center allocations in SAP S/4HANA、

    A.Product cost accounting

    B.General ledger accounting

    C.Account-based profitability analysis

    D.Cost center accounting

    开始考试点击查看答案
返回顶部