Which of the following statements best describe Product Cost by Order、 Note: There are 2correct answers to this question.
A.It is used when you perform repetitive manufacturing.
B.It is recommended for products with a long production time.
C.It is used when full cost traceability is neede
D.D.It is used when controlling by individual production lots or discrete quantities is needed.
试卷相关题目
- 1What are some of the characteristics of planning for internal orders、 Note: There are 2correct answers to this question.
A.You can plan multiple versions.
B.You can enter costs and revenues.
C.You can define tolerance limits for plan overspen
D.D.Availability control can check against plan values.
开始考试点击查看答案 - 2Which type of Profitability Analysis updates the cost of goods sold at the time of delivery、
A.Periodic-accounting based
B.Both account-based and costing-based
C.Account-based only
D.Costing-based only
开始考试点击查看答案 - 3You create alternative CO versions for your controlling area, in addition to version 0. Whatwould you use additional CO versions for、 Note: There are 2 correct answers to this question.
A.To store data of alternative plan costing runs
B.To store different plan data
C.To store data of parallel valuation
D.To store different budget data
开始考试点击查看答案 - 4What master data objects can you set up using time-based fields、 Note: There are 2 correct answers to this question.
A.Cost centers
B.Statistical key figures
C.Activity type
D.Cost element
开始考试点击查看答案 - 5You are creating new activity type and want to maintain plan prices for a cost center. Whichattribute must you configure in the activity type master record、 Note: There are 3 correct answers tothis question.
A.CO version
B.Valid cost center categories
C.Company code
D.Price indicator
E.Activity type category
开始考试点击查看答案 - 6At what level do you create the structure of the operating concern、
A.Sales organization level
B.Controlling area level
C.Client level
D.Company code level
开始考试点击查看答案 - 7In which module do you process profit center allocations in SAP S/4HANA、
A.Product cost accounting
B.General ledger accounting
C.Account-based profitability analysis
D.Cost center accounting
开始考试点击查看答案 - 8In a standard system delivery, how many free characteristics can be added to an operating concern、
A.0-70
B.101-150
C.71-100
D.Over 150
开始考试点击查看答案 - 9What does SAP/S4HANA select line-item-based data for costing based Profitability Analysis reports、
A.It select actual data from table CE2XXXX and plan data from CE3XXXX.
B.It select actual data from table ACDOCA and plan data from ACDOCP.
C.It select actual data from table CE1XXXX and plan data from CE2XXXX.
D.It select actual data from table ACDOCA and plan data from COSP.
开始考试点击查看答案 - 10How does SAP S/4HANA capture costs、 Note: There are 2 correct answers to this question.
A.Secondary costs are captured as secondary cost element, and not as general ledger accounts.
B.Primary and secondary costs are captured in general ledger accounts.
C.All primary and secondary costs are captured by creating them as cost elements.
D.Only primary costs are captured in general ledger accounts.
开始考试点击查看答案
最新试卷
注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它注册安全工程师注册安全工程师安全生产技术2014年安全工程师
类别:建筑类其它