位置:首页 > 题库频道 > 其它分类 > 计算机其它 > Oracle认证Oracle认证Oracle认证PA-CO

You want to create cost centers for your company. What is the prerequisite to build an organizational structure for overhead cost controlling、

发布时间:2024-07-09

A.Person responsible

B.Profit center

C.Standard hierarchy top node

D.Cost center categories

试卷相关题目

  • 1You want to determine which operations of the routing should be considered in a productcost calculation.How do you do this、 Note: There are 2 correct answers to this question.

    A.By marking the cost indicator in the control key assigned to the operation

    B.By marking the Relevance to Costing indicator in the operation

    C.By assigning a cost center to the work center in the operation

    D.By defining a usage key in the header of the routing.

    开始考试点击查看答案
  • 2You want to create a new standard cost estimate based on the quantity structure of theexisting standard cost estimate. Which object do you use、(A). Costing type(B). Reference variant(C). Transfer control(D). Costing version

    A.Costing type

    B.Reference variant

    C.Transfer control

    D.Costing version

    开始考试点击查看答案
  • 3Which parameters are controlled by the costing type in a costing variant、 Note: There are 2correct answers to this question.

    A.Save with date key

    B.Price updates

    C.Costing sheet

    D.Price for materials

    开始考试点击查看答案
  • 4Why would you use manual cost allocation in Controlling、 Note: There are 2 correct answersto this question.(A). To run simple allocations of actual data(B). To run simple allocations of plan data(C). To correct secondary postings(D). To allocate costs using an allocation cycle

    A.To run simple allocations of actual data

    B.To run simple allocations of plan data

    C.To correct secondary postings

    D.To allocate costs using an allocation cycle

    开始考试点击查看答案
  • 5You are configuring internal order settlement. What do you define which cost element shouldbe settled, using either the original settlement cost elements、

    A.Credit component (of the costing sheet)

    B.Allocation structure

    C.Settlement profile

    D.Settlement rule

    开始考试点击查看答案
  • 6You are creating new activity type and want to maintain plan prices for a cost center. Whichattribute must you configure in the activity type master record、 Note: There are 3 correct answers tothis question.

    A.CO version

    B.Valid cost center categories

    C.Company code

    D.Price indicator

    E.Activity type category

    开始考试点击查看答案
  • 7What master data objects can you set up using time-based fields、 Note: There are 2 correct answers to this question.

    A.Cost centers

    B.Statistical key figures

    C.Activity type

    D.Cost element

    开始考试点击查看答案
  • 8You create alternative CO versions for your controlling area, in addition to version 0. Whatwould you use additional CO versions for、 Note: There are 2 correct answers to this question.

    A.To store data of alternative plan costing runs

    B.To store different plan data

    C.To store data of parallel valuation

    D.To store different budget data

    开始考试点击查看答案
  • 9Which type of Profitability Analysis updates the cost of goods sold at the time of delivery、

    A.Periodic-accounting based

    B.Both account-based and costing-based

    C.Account-based only

    D.Costing-based only

    开始考试点击查看答案
  • 10What are some of the characteristics of planning for internal orders、 Note: There are 2correct answers to this question.

    A.You can plan multiple versions.

    B.You can enter costs and revenues.

    C.You can define tolerance limits for plan overspen

    D.D.Availability control can check against plan values.

    开始考试点击查看答案
返回顶部