位置:首页 > 题库频道 > 其它分类 > 计算机其它 > Oracle认证Oracle认证Oracle认证PA-CO

You are configuring internal order settlement. What do you define which cost element shouldbe settled, using either the original settlement cost elements、

发布时间:2024-07-09

A.Credit component (of the costing sheet)

B.Allocation structure

C.Settlement profile

D.Settlement rule

试卷相关题目

  • 1You want to run an assessment cycle in Profitability Analysis to allocate cost center costsduring period-end closing for your organization. Which of the following objects is part of theassessment cycle、

    A.Cycle iteration

    B.Tracing factor

    C.Sender cost objects

    D.Template

    开始考试点击查看答案
  • 2Which default values can you configure for the product cost collector、 Note: There are 2correct answers to this question.

    A.Result Analysis (RA) Version

    B.Result Analysis (RA) key

    C.Costing variant for preliminary costing

    D.Variance variant

    开始考试点击查看答案
  • 3You want to setup integrated planning for your internal order. What do you need to do、Note: There are 2 correct answers to this question.

    A.Set the relevant indicators in the CO version.

    B.Set the relevant indicator in the controlling area.

    C.Set the relevant indicator in the planning profile of the order type.

    D.Set the relevant indicator in the internal order master record.

    开始考试点击查看答案
  • 4You want to maintain a cost component structure. What can you determine for each cost component、 Note: There are 3 correct answers to this question.

    A.Relevance of cost component to inventory valuation

    B.Assignment of cost component to calculation base for overheads in costing sheet

    C.Relevance of cost component to results analysis

    D.Relevance of cost component to goods manufactured

    E.Assignment of cost component of cost component group

    开始考试点击查看答案
  • 5You want to use budget availability control for your projects and internal orders. What can you check using budget availability control、 Note: There are 2 correct answers to this question.

    A.The availability of funds using overall plan value

    B.The availability of funds according to tolerance limits

    C.The availability of funds in object currency

    D.The availability of funds on period level

    开始考试点击查看答案
  • 6Why would you use manual cost allocation in Controlling、 Note: There are 2 correct answersto this question.(A). To run simple allocations of actual data(B). To run simple allocations of plan data(C). To correct secondary postings(D). To allocate costs using an allocation cycle

    A.To run simple allocations of actual data

    B.To run simple allocations of plan data

    C.To correct secondary postings

    D.To allocate costs using an allocation cycle

    开始考试点击查看答案
  • 7Which parameters are controlled by the costing type in a costing variant、 Note: There are 2correct answers to this question.

    A.Save with date key

    B.Price updates

    C.Costing sheet

    D.Price for materials

    开始考试点击查看答案
  • 8You want to create a new standard cost estimate based on the quantity structure of theexisting standard cost estimate. Which object do you use、(A). Costing type(B). Reference variant(C). Transfer control(D). Costing version

    A.Costing type

    B.Reference variant

    C.Transfer control

    D.Costing version

    开始考试点击查看答案
  • 9You want to determine which operations of the routing should be considered in a productcost calculation.How do you do this、 Note: There are 2 correct answers to this question.

    A.By marking the cost indicator in the control key assigned to the operation

    B.By marking the Relevance to Costing indicator in the operation

    C.By assigning a cost center to the work center in the operation

    D.By defining a usage key in the header of the routing.

    开始考试点击查看答案
  • 10You want to create cost centers for your company. What is the prerequisite to build an organizational structure for overhead cost controlling、

    A.Person responsible

    B.Profit center

    C.Standard hierarchy top node

    D.Cost center categories

    开始考试点击查看答案
返回顶部