Which default values can you configure for the product cost collector、 Note: There are 2correct answers to this question.

发布时间:2024-07-09

A.Result Analysis (RA) Version

B.Result Analysis (RA) key

C.Costing variant for preliminary costing

D.Variance variant

试卷相关题目

  • 1You want to setup integrated planning for your internal order. What do you need to do、Note: There are 2 correct answers to this question.

    A.Set the relevant indicators in the CO version.

    B.Set the relevant indicator in the controlling area.

    C.Set the relevant indicator in the planning profile of the order type.

    D.Set the relevant indicator in the internal order master record.

    开始考试点击查看答案
  • 2You want to maintain a cost component structure. What can you determine for each cost component、 Note: There are 3 correct answers to this question.

    A.Relevance of cost component to inventory valuation

    B.Assignment of cost component to calculation base for overheads in costing sheet

    C.Relevance of cost component to results analysis

    D.Relevance of cost component to goods manufactured

    E.Assignment of cost component of cost component group

    开始考试点击查看答案
  • 3You want to use budget availability control for your projects and internal orders. What can you check using budget availability control、 Note: There are 2 correct answers to this question.

    A.The availability of funds using overall plan value

    B.The availability of funds according to tolerance limits

    C.The availability of funds in object currency

    D.The availability of funds on period level

    开始考试点击查看答案
  • 4What values flow from Sales and Distribution billing to costing-based Profitability Analysis、 Note: There are2 correct answers to this question.

    A.Cost of goods sold split by cost components

    B.Value of "Gross Margin 2"

    C.Production variances split by variance categories

    D.Value of conditions of pricing procedure

    开始考试点击查看答案
  • 5Which statement best describes the Query Browser for reporting、

    A.It is a desktop browser that integrates with SAP S/4HANA.

    B.It is the frontend used to define reports in Analysis for Office.

    C.It is available as an additional license product in SAP S/4HANA.

    D.It is a design studio app that comes as standard SAP Fiori content.

    开始考试点击查看答案
  • 6You want to run an assessment cycle in Profitability Analysis to allocate cost center costsduring period-end closing for your organization. Which of the following objects is part of theassessment cycle、

    A.Cycle iteration

    B.Tracing factor

    C.Sender cost objects

    D.Template

    开始考试点击查看答案
  • 7You are configuring internal order settlement. What do you define which cost element shouldbe settled, using either the original settlement cost elements、

    A.Credit component (of the costing sheet)

    B.Allocation structure

    C.Settlement profile

    D.Settlement rule

    开始考试点击查看答案
  • 8Why would you use manual cost allocation in Controlling、 Note: There are 2 correct answersto this question.(A). To run simple allocations of actual data(B). To run simple allocations of plan data(C). To correct secondary postings(D). To allocate costs using an allocation cycle

    A.To run simple allocations of actual data

    B.To run simple allocations of plan data

    C.To correct secondary postings

    D.To allocate costs using an allocation cycle

    开始考试点击查看答案
  • 9Which parameters are controlled by the costing type in a costing variant、 Note: There are 2correct answers to this question.

    A.Save with date key

    B.Price updates

    C.Costing sheet

    D.Price for materials

    开始考试点击查看答案
  • 10You want to create a new standard cost estimate based on the quantity structure of theexisting standard cost estimate. Which object do you use、(A). Costing type(B). Reference variant(C). Transfer control(D). Costing version

    A.Costing type

    B.Reference variant

    C.Transfer control

    D.Costing version

    开始考试点击查看答案