位置:首页 > 题库频道 > 其它分类 > 计算机其它 > Oracle认证Oracle认证Oracle认证PA-CO

What values flow from Sales and Distribution billing to costing-based Profitability Analysis、 Note: There are2 correct answers to this question.

发布时间:2024-07-09

A.Cost of goods sold split by cost components

B.Value of "Gross Margin 2"

C.Production variances split by variance categories

D.Value of conditions of pricing procedure

试卷相关题目

  • 1Which statement best describes the Query Browser for reporting、

    A.It is a desktop browser that integrates with SAP S/4HANA.

    B.It is the frontend used to define reports in Analysis for Office.

    C.It is available as an additional license product in SAP S/4HANA.

    D.It is a design studio app that comes as standard SAP Fiori content.

    开始考试点击查看答案
  • 2Which statements best describes a single cost center standard hierarchy、

    A.It is a structure to which all cost center groups create for a controlling area are assigned.

    B.It is a structure to which all cost center groups created within an operating concern are assigned.

    C.It is a structure to which all the cost centers within an operating concern are assigne

    D.D.It is a structure to which all the cost centers within a controlling area are assigned.

    开始考试点击查看答案
  • 3Which field can you select for both reporting in costing based and account-based ProfitabilityAnalysis、

    A.Value in Controlling Area Currency

    B.Version

    C.Record type

    D.Cost element

    开始考试点击查看答案
  • 4You create a new profit center. Which company code(s) is it assigned to by default、

    A.All company codes where profit center accounting is activated.

    B.All company codes maintained in your authorization profile

    C.All company codes within the controlling area.

    D.All company codes to which the profit center standard hierarchy is assigned to.

    开始考试点击查看答案
  • 5You are setting up a direct internal activity allocation in SAP S4/HAN

    A.What is valid receiversfor the activity、 Note: There are 3 correct answers to this question.A.Profit center

    B.WBS element

    C.Sales order item

    D.Internal order

    E.General ledger account

    开始考试点击查看答案
  • 6You want to use budget availability control for your projects and internal orders. What can you check using budget availability control、 Note: There are 2 correct answers to this question.

    A.The availability of funds using overall plan value

    B.The availability of funds according to tolerance limits

    C.The availability of funds in object currency

    D.The availability of funds on period level

    开始考试点击查看答案
  • 7You want to maintain a cost component structure. What can you determine for each cost component、 Note: There are 3 correct answers to this question.

    A.Relevance of cost component to inventory valuation

    B.Assignment of cost component to calculation base for overheads in costing sheet

    C.Relevance of cost component to results analysis

    D.Relevance of cost component to goods manufactured

    E.Assignment of cost component of cost component group

    开始考试点击查看答案
  • 8You want to setup integrated planning for your internal order. What do you need to do、Note: There are 2 correct answers to this question.

    A.Set the relevant indicators in the CO version.

    B.Set the relevant indicator in the controlling area.

    C.Set the relevant indicator in the planning profile of the order type.

    D.Set the relevant indicator in the internal order master record.

    开始考试点击查看答案
  • 9Which default values can you configure for the product cost collector、 Note: There are 2correct answers to this question.

    A.Result Analysis (RA) Version

    B.Result Analysis (RA) key

    C.Costing variant for preliminary costing

    D.Variance variant

    开始考试点击查看答案
  • 10You want to run an assessment cycle in Profitability Analysis to allocate cost center costsduring period-end closing for your organization. Which of the following objects is part of theassessment cycle、

    A.Cycle iteration

    B.Tracing factor

    C.Sender cost objects

    D.Template

    开始考试点击查看答案
返回顶部