位置:首页 > 题库频道 > 其它分类 > 计算机其它 > Oracle认证Oracle认证Oracle认证PA-CO

Which field can you select for both reporting in costing based and account-based ProfitabilityAnalysis、

发布时间:2024-07-09

A.Value in Controlling Area Currency

B.Version

C.Record type

D.Cost element

试卷相关题目

  • 1You create a new profit center. Which company code(s) is it assigned to by default、

    A.All company codes where profit center accounting is activated.

    B.All company codes maintained in your authorization profile

    C.All company codes within the controlling area.

    D.All company codes to which the profit center standard hierarchy is assigned to.

    开始考试点击查看答案
  • 2You are setting up a direct internal activity allocation in SAP S4/HAN

    A.What is valid receiversfor the activity、 Note: There are 3 correct answers to this question.A.Profit center

    B.WBS element

    C.Sales order item

    D.Internal order

    E.General ledger account

    开始考试点击查看答案
  • 3What are some of the characteristics of SAP Core Data Services (CDS) views、 Note: There are3 correct answers to this question.

    A.CDS views are considered system modifications.

    B.CDS views have ready-to-use content.

    C.CDS views duplicate data for reporting efficiencies.

    D.CDS views have no latency.

    E.CDS views support authorization.

    开始考试点击查看答案
  • 4You are running an indirect activity allocation. What do you post to the sender and receiver、 

    A.You post only cost to both the sender and receiver.

    B.You post quantity and cost to both the sender and receiver.

    C.You post both quantity and cost to the sender, and cost only to the receiver.

    D.You post both quantity and cost to the receiver, and cost only to the sender.

    开始考试点击查看答案
  • 5In the material master record there are three planned prices: ""Planned price 1"", ""Plannedprice2""and""Planned price 3"". What do you use them for、

    A.To valuate goods movement

    B.To valuate the materials in cost estimates

    C.To valuate material stocks

    D.To update the standard price during the release of a standard cost estimate

    开始考试点击查看答案
  • 6Which statements best describes a single cost center standard hierarchy、

    A.It is a structure to which all cost center groups create for a controlling area are assigned.

    B.It is a structure to which all cost center groups created within an operating concern are assigned.

    C.It is a structure to which all the cost centers within an operating concern are assigne

    D.D.It is a structure to which all the cost centers within a controlling area are assigned.

    开始考试点击查看答案
  • 7Which statement best describes the Query Browser for reporting、

    A.It is a desktop browser that integrates with SAP S/4HANA.

    B.It is the frontend used to define reports in Analysis for Office.

    C.It is available as an additional license product in SAP S/4HANA.

    D.It is a design studio app that comes as standard SAP Fiori content.

    开始考试点击查看答案
  • 8What values flow from Sales and Distribution billing to costing-based Profitability Analysis、 Note: There are2 correct answers to this question.

    A.Cost of goods sold split by cost components

    B.Value of "Gross Margin 2"

    C.Production variances split by variance categories

    D.Value of conditions of pricing procedure

    开始考试点击查看答案
  • 9You want to use budget availability control for your projects and internal orders. What can you check using budget availability control、 Note: There are 2 correct answers to this question.

    A.The availability of funds using overall plan value

    B.The availability of funds according to tolerance limits

    C.The availability of funds in object currency

    D.The availability of funds on period level

    开始考试点击查看答案
  • 10You want to maintain a cost component structure. What can you determine for each cost component、 Note: There are 3 correct answers to this question.

    A.Relevance of cost component to inventory valuation

    B.Assignment of cost component to calculation base for overheads in costing sheet

    C.Relevance of cost component to results analysis

    D.Relevance of cost component to goods manufactured

    E.Assignment of cost component of cost component group

    开始考试点击查看答案
返回顶部