A mooring winch should be equipped with mechanical brakes capable of holding ______.
A.half the breaking strength of the mooring line
B.the full breaking strength of the mooring line
C.the maximum expected tension(张力) of the mooring line
D.50% over the working tension of the mooring line
试卷相关题目
- 1If an anchor windlass has been idle for some time, you should ______.
A.repack all valve stems
B.lubricate it prior to use
C.replace the foundation bolts
D.balance the warping heads
开始考试点击查看答案 - 2The oil in a cargo winch gear box should be sampled periodically(周期性地) to ______.
A.prevent the gear box from leaking
B.prevent the oil from becoming inflammable(易燃的)
C.make sure it has not become contaminated(污染)
D.make sure the motor bearings are lubricated
开始考试点击查看答案 - 3Positive displacement, helical gear(斜齿轮) pumps are well suited for pumping oil because ______.
A.stuffing boxes eliminate the leakage problems usually associated with other gear pumps
B.it is not necessary to closely maintain design clearances with this pump
C.they are essentially self-priming and produce a high suction lift
D.these pumps are designed with extreme tooth angles
开始考试点击查看答案 - 4Among the basic categories of equipment, which of the following are used to allow the hydraulic energy to be controlled、
A.hydraulic pumps
B.valves
C.hydraulic cylinders
D.hydraulic motors
开始考试点击查看答案 - 5When securing a flash-type evaporator for an extended period of time, you should ______.
A.fill the unit with saltwater
B.fill the unit with descaling compound
C.completely drain the unit
D.tightly seal the unit to exclude air
开始考试点击查看答案 - 6Hydraulic cranes must be properly warmed-up before being operated because ______.
A.warm-up allows the hydraulic system to become charged with oil
B.warm-up allows the relief valves to be properly tested
C.hydraulic strainers operate only during the warm-up period
D.hydraulic fluid must be at the proper viscosity
开始考试点击查看答案 - 7The current flowing first in one direction and then in another is called ____ current.
A.a rush
B.an alternating
C.a direct
D.an exciting
开始考试点击查看答案 - 8The frequency of an alternator at a given RPM is determined by the ______.
A.number of turns of wire in the armature coil
B.number of magnetic poles
C.strength of the magnets used
D.output voltage
开始考试点击查看答案 - 9While paralleling two AC generators using synchronizing(同步的) lamps only, both lamps will go dark when the generators are ______.
A.running at the same speed
B.grounded
C.of the same polarity(极性)
D.in phase
开始考试点击查看答案 - 10The load sharing characteristics of two diesel generators operating in parallel are mostly dependent on their governor ______.
A.load limit settings
B.idle speed settings
C.speed limit settings
D.speed droop settings
开始考试点击查看答案
最新试卷
投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2009年投资建设项
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它