When securing a flash-type evaporator for an extended period of time, you should ______.
A.fill the unit with saltwater
B.fill the unit with descaling compound
C.completely drain the unit
D.tightly seal the unit to exclude air
试卷相关题目
- 1When a vacuum boiling evaporator works, the hot jacket water will pass over the tube stack and ___ the sea water passing through the tubes.
A.dispose
B.dissolve
C.heat
D.dissipates
开始考试点击查看答案 - 2Dirty oil must be _____ before being used again.
A.mixed with clean oil
B.purified
C.heated
D.strained
开始考试点击查看答案 - 3Great care is dedicated to the removal of _____ from the scavenge air.
A.gravity
B.viscosity
C.density
D.humidity
开始考试点击查看答案 - 4Most marine biological sewage treatment plants consist of all the following statements except ______.
A.aeration tanks
B.settling tanks
C.disinfection agent
D.anaerobic bacteria (厌氧菌)
开始考试点击查看答案 - 5The oil sludge is burnt in the ______onboard. I’ll show you the ashes.
A.boiler
B.main engine
C.auxiliary engine
D.incinerator
开始考试点击查看答案 - 6Among the basic categories of equipment, which of the following are used to allow the hydraulic energy to be controlled、
A.hydraulic pumps
B.valves
C.hydraulic cylinders
D.hydraulic motors
开始考试点击查看答案 - 7Positive displacement, helical gear(斜齿轮) pumps are well suited for pumping oil because ______.
A.stuffing boxes eliminate the leakage problems usually associated with other gear pumps
B.it is not necessary to closely maintain design clearances with this pump
C.they are essentially self-priming and produce a high suction lift
D.these pumps are designed with extreme tooth angles
开始考试点击查看答案 - 8The oil in a cargo winch gear box should be sampled periodically(周期性地) to ______.
A.prevent the gear box from leaking
B.prevent the oil from becoming inflammable(易燃的)
C.make sure it has not become contaminated(污染)
D.make sure the motor bearings are lubricated
开始考试点击查看答案 - 9If an anchor windlass has been idle for some time, you should ______.
A.repack all valve stems
B.lubricate it prior to use
C.replace the foundation bolts
D.balance the warping heads
开始考试点击查看答案 - 10A mooring winch should be equipped with mechanical brakes capable of holding ______.
A.half the breaking strength of the mooring line
B.the full breaking strength of the mooring line
C.the maximum expected tension(张力) of the mooring line
D.50% over the working tension of the mooring line
开始考试点击查看答案
最新试卷
投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2009年投资建设项
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它