位置:首页 > 题库频道 > 其它分类 > 外语类其它 > 其他其他其他2007年第2期海船船员适任证书全国统考试题(总第43期)

If an anchor windlass has been idle for some time, you should ______.

发布时间:2024-07-09

A.repack all valve stems

B.lubricate it prior to use

C.replace the foundation bolts

D.balance the warping heads

试卷相关题目

  • 1The oil in a cargo winch gear box should be sampled periodically(周期性地) to ______.

    A.prevent the gear box from leaking

    B.prevent the oil from becoming inflammable(易燃的)

    C.make sure it has not become contaminated(污染)

    D.make sure the motor bearings are lubricated

    开始考试点击查看答案
  • 2Positive displacement, helical gear(斜齿轮) pumps are well suited for pumping oil because ______.

    A.stuffing boxes eliminate the leakage problems usually associated with other gear pumps

    B.it is not necessary to closely maintain design clearances with this pump

    C.they are essentially self-priming and produce a high suction lift

    D.these pumps are designed with extreme tooth angles

    开始考试点击查看答案
  • 3Among the basic categories of equipment, which of the following are used to allow the hydraulic energy to be controlled、

    A.hydraulic pumps

    B.valves

    C.hydraulic cylinders

    D.hydraulic motors

    开始考试点击查看答案
  • 4When securing a flash-type evaporator for an extended period of time, you should ______.

    A.fill the unit with saltwater

    B.fill the unit with descaling compound

    C.completely drain the unit

    D.tightly seal the unit to exclude air

    开始考试点击查看答案
  • 5When a vacuum boiling evaporator works, the hot jacket water will pass over the tube stack and ___ the sea water passing through the tubes.

    A.dispose

    B.dissolve

    C.heat

    D.dissipates

    开始考试点击查看答案
  • 6A mooring winch should be equipped with mechanical brakes capable of holding ______.

    A.half the breaking strength of the mooring line

    B.the full breaking strength of the mooring line

    C.the maximum expected tension(张力) of the mooring line

    D.50% over the working tension of the mooring line

    开始考试点击查看答案
  • 7Hydraulic cranes must be properly warmed-up before being operated because ______.

    A.warm-up allows the hydraulic system to become charged with oil

    B.warm-up allows the relief valves to be properly tested

    C.hydraulic strainers operate only during the warm-up period

    D.hydraulic fluid must be at the proper viscosity

    开始考试点击查看答案
  • 8The current flowing first in one direction and then in another is called ____ current.

    A.a rush

    B.an alternating

    C.a direct

    D.an exciting

    开始考试点击查看答案
  • 9The frequency of an alternator at a given RPM is determined by the ______.

    A.number of turns of wire in the armature coil

    B.number of magnetic poles

    C.strength of the magnets used

    D.output voltage

    开始考试点击查看答案
  • 10While paralleling two AC generators using synchronizing(同步的) lamps only, both lamps will go dark when the generators are ______.

    A.running at the same speed

    B.grounded

    C.of the same polarity(极性)

    D.in phase

    开始考试点击查看答案
返回顶部