位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(19,20)

which of the following depreciation methods provides for accelerated depreciation of an asset:

发布时间:2024-07-09

A.double declining balance.

B.straight line.

C.exponential depreciation

D.double sum of the years digits

E.double increasing balance

试卷相关题目

  • 1the statement of work (sow) is developed during the (    ) cycle.

    A.award

    B.solicitations

    C.requirements

    D.contractual

    E.requisitions

    开始考试点击查看答案
  • 2selection criteria for project selection include:

    A.cost versus benefit

    B.risk

    C.contribution towards organizational goals

    D.rate of return

    E.all of the above.

    开始考试点击查看答案
  • 3resource leveling will often affect the project by making it:

    A.shorter.

    B.longer

    C.more responsive to customer needs.

    D.a and c

    E.b and c.

    开始考试点击查看答案
  • 4quality and (    ) are directly related.

    A.productivity

    B.cost overruns

    C.scope control

    D.pareto diagram

    E.none of the above.

    开始考试点击查看答案
  • 5advantages of the functional (hierarchical) form of organization include (    ) and creation of technicalcompetence.

    A.ease of horizontal coordination

    B.clearly defined authority

    C.high information processing capability

    D.single voice to customers

    开始考试点击查看答案
  • 6a plan has budgeted three weeks of effort for consultants, but the job was done in only two weeks. calculate the variance:

    A.0.015

    B.0.33

    C.0.75

    D.0.67

    E.none of the above.

    开始考试点击查看答案
  • 7a warranty may not be a remedy for products delivered unfit when (    ) .

    A.the pm has knowledge of the product, inspected it without relying on the seller's skill

    B.the products delivered comply with the plans and specifications of the client

    C.the plans and specifications produced by the seller match the completed product.

    D.a and b

    E.none of the above.

    开始考试点击查看答案
  • 8graphical displays of accumulated cost and labor hours, plotted as a function of time, are called:

    A.variance reports

    B.s curves

    C.trend analysis

    D.earned value reporting

    E.baseline control

    开始考试点击查看答案
  • 9quality control is normally performed by the (    ) .

    A.qa personnel

    B.project team

    C.operating personnel

    D.project management

    E.none of the above.

    开始考试点击查看答案
  • 10situations calling for a matrix organization include outside pressure for dual focus, (    ) andpressure for high information processingcapability.

    A.pressure for clear accountability

    B.pressure for reduced duplication of effort

    C.pressure for shared resources

    D.pressure for formalized communication

    开始考试点击查看答案