for communication to occur, there must be:

发布时间:2024-07-09

A.two or more people involved

B.the transmittal of information

C.a communication process

D.all of the above

E.b and c only

试卷相关题目

  • 1assigning resources in an attempt to find the shortest project schedule consistent with fixed resource limits is called resource (    ).

    A.allocation.

    B.partitioning

    C.leveling

    D.quantification.

    E.none of above.

    开始考试点击查看答案
  • 2a (    ) estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).

    A.parametric

    B.definitive.

    C.budget

    D.bottom up.

    E.top down.

    开始考试点击查看答案
  • 3which of the following terms refers to the situation where the work is being used for the purpose intended and so certified:

    A.beneficial completion

    B.substantial completion

    C.project completion

    D.contract closeout

    E.final completion

    开始考试点击查看答案
  • 4which of the following scheduling methods uses more of the risk management concepts:

    A.adm

    B.pdm

    C.cpm

    D.pert

    E.gantt

    开始考试点击查看答案
  • 5when subordinates know pertinent information that is not known by the project manager, the result is:

    A.blindspot

    B.facade

    C.region of influence

    D.communication power base

    E.none of the above

    开始考试点击查看答案
  • 6the ability to get an individual or group to perform a given task is best described as:

    A.authority

    B.power

    C.influence

    D.leadership

    E.coerciveness

    开始考试点击查看答案
  • 7the comprehensive review of a contractor's technical performance, cost performance, and delivery schedule, is referred to as:

    A.post project evaluation

    B.post contract evaluation

    C.post mortem

    D.procurement performance evaluation

    E.contractor's performance evaluation

    开始考试点击查看答案
  • 8the financial closeout of a project dictates that:

    A.all project funds have been spent.

    B.no charge numbers have been overrun.

    C.no follow-on work from this client is possible.

    D.no further charges can be made against the project.

    E.all of the above.

    开始考试点击查看答案
  • 9two sources of variation in the length of hex bolts exist. production variation and measurement error. the qc manager knows that thestandard deviation from these sources is 0.24" and 0.43" , respectively. what is the total standard deviation.

    A..10 inch.

    B..19 inch.

    C..34 inch.

    D..49 inch.

    E..67 inch.

    开始考试点击查看答案
  • 10which of the following activities can be considered as part of risk mitigation

    A.risk identification

    B.purchasing insurance

    C.assessment of outcomes

    D.assessment of probabilities

    E.c and d only

    开始考试点击查看答案