位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(21,22)

excessive flexibility in specifying requirements will (    ) the likelihood of time overruns.

发布时间:2024-07-09

A.reduce.

B.eliminate.

C.double

D.increase

E.not affect

试卷相关题目

  • 1cip embodies which of the following principals、

    A.constancy of purpose

    B.customer focus and involvement

    C.total involvement

    D.teamwork

    E.all of the above.

    开始考试点击查看答案
  • 2the key purpose of project control is to:

    A.plan ahead for uncertainties.

    B.generate status reports.

    C.keep the project on track.

    D.develop the project road map.

    E.all of the above.

    开始考试点击查看答案
  • 3the key ingredient to a successful quality management program are (    ).

    A.management's quality philosophy, operational quality assurance and operational quality control.

    B.quality evaluation methods and functional quality integrators.

    C.technical quality administration, the technical quality specifications, and the quality process review.

    D.quality evaluation methods, quality progress reviews and the technical quality specifications.

    E.all of the above.

    开始考试点击查看答案
  • 4the contractual statement of work (csow)

    A.must be the same as the proposal statement of work

    B.does not identify reporting requirements

    C.can be at a different level of detail (i.e. wbs level) than the proposal statement of work

    D.identifies the contractor's organizational structure for the project

    E.all of the above

    开始考试点击查看答案
  • 5the (    ) specification delineates specific end use capabilities which can be tested in the acceptance procedure.

    A.performance

    B.functional

    C.technical

    D.base line

    E.operational

    开始考试点击查看答案
  • 6listening involves more than hearing sounds. the good listener

    A.repeats some of the things said

    B.finishes the speaker's sentences

    C.writes everything down

    D.nods his head frequently

    开始考试点击查看答案
  • 7project life cycles provide a better means of measurement of progress and control. the four phases of a project are conceptual development,(    ), (    ), and (    ).

    A.preliminary planning, detail planning, closeout

    B.implementation, reporting, termination

    C.development, implementation, termination

    D.execution, reporting, finishing

    E.implementation, termination, post-audit review

    开始考试点击查看答案
  • 8response planning is the responsibility of the functional areas and considers

    A.mitigation.

    B.deflection.

    C.contingency planning.

    D.unforeseen occurrences.

    E.all of the above.

    开始考试点击查看答案
  • 9the definitive terms of a contract are written during which of the following contract phases、

    A.contract phase

    B.post-award phase

    C.award phase

    D.pre-award phase

    E.requirement phase

    开始考试点击查看答案
  • 10the sending or conveying of information from one place to another is the process of

    A.networking

    B.transmitting

    C.interacting

    D.promoting

    E.interfacing

    开始考试点击查看答案
返回顶部