there are hard causes of conflict (e.g. conflicting schedules) and soft causes. soft causes are as important as hard causes. soft causesinclude diversity of disciplinary expertise, (    ), and the project manager's power of reward and punishment.

发布时间:2024-07-09

A.performance tradeoffs

B.ambiguity of roles

C.administrative procedures

D.determining earned value

试卷相关题目

  • 1risk event status is defined as (    ) .

    A.risk probability x amount at stake.

    B.the severity of the consequences.

    C.how likely the event is to occur with risk.

    D.(cost + benefit + business risk) / insurable risk.

    E.b and c

    开始考试点击查看答案
  • 2non-conformance penalties are a form of (    ).

    A.quality incentive

    B.risk sharing

    C.contract negotiations

    D.quality assurance programs

    E.none of the above.

    开始考试点击查看答案
  • 3group brainstorming encourages all of the following except:

    A.team building

    B.uninhibited verbalization

    C.decision making

    D.analysis of alternatives

    E.convergent thinking

    开始考试点击查看答案
  • 4as a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:

    A.insignificant.

    B.reduced.

    C.unchange

    D.C.unchanged.D.increased.

    E.doubled.

    开始考试点击查看答案
  • 5a project manager believes that modifying the scope of the project may provide added value for the customer. the project manager should:

    A.change the scope baseline

    B.prepare a variance report

    C.call a meeting of the configuration control board

    D.change the project's objectives

    E.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

    开始考试点击查看答案