位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(17,18)

a technical requirement has which of the following characteristics:

发布时间:2024-07-09

A.easy to understand

B.a communication tool between the user and the design team

C.written in non-technical language

D.developed in cooperation with the user

E.typically describe physical dimensions and performance requirements

试卷相关题目

  • 1a legally binding document offered unilaterally is a (    ) .

    A.purchase order

    B.scope of work description

    C.contract stipulation

    D.level of effort proposal

    E.request for proposal

    开始考试点击查看答案
  • 2which of the following fall(s) under the responsibilities of a project manager、

    A.labor relations with project personnel

    B.affirmative action

    C.personnel training

    D.discrimination and equal employment opportunity

    E.all of the above

    开始考试点击查看答案
  • 3when a project manager is running over the budgeted costs, the project manager can typically (    ) to attempt to get the project back onbudget.

    A.reduce features and/or functionality

    B.increase risk.

    C.incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)

    D.all of the abov

    E.E.a and b only

    开始考试点击查看答案
  • 4the project charter is developed by:

    A.senior management

    B.the customer

    C.the project manager

    D.both a and c

    E.none of the above.

    开始考试点击查看答案
  • 5the best way to insure quality conformance is to (    ).

    A.distribute the responsibility to subordinates.

    B.maintain total control.

    C.train each worker to implement the work.

    D.inspect quality into the project.

    E.none of the above.

    开始考试点击查看答案
  • 6if a project manager communicates a verbal message to a subordinate, and the subordinate leaves without saying a word, the projectmanager should assume:

    A.the message was understood

    B.the message was not understood

    C.the subordinate discarded the information

    D.the information was not appropriate

    E.none of the above.

    开始考试点击查看答案
  • 7inspection of a complex project according to specifications is accomplished by (    ).

    A.inspection by attributes.

    B.cyclical inspection

    C.quality conformance inspection

    D.original inspection

    E.none of the above.

    开始考试点击查看答案
  • 8the behavioral responsibilities of a project manager may also include dealing with:

    A.the public

    B.regulatory personnel

    C.the legal environment

    D.environmental issues

    E.all of the above

    开始考试点击查看答案
  • 9the difference between the bcws and the bcwp is referred to as the:

    A.schedule variance

    B.cost variance.

    C.estimate of completion

    D.actual cost of the work performed

    E.none of the above

    开始考试点击查看答案
  • 10"paraphrasing" is most closely associated with which part of the communication process、

    A.encoding

    B.decoding

    C.barriers

    D.feedback

    E.none of the above.

    开始考试点击查看答案
返回顶部