a technical requirement has which of the following characteristics:
A.easy to understand
B.a communication tool between the user and the design team
C.written in non-technical language
D.developed in cooperation with the user
E.typically describe physical dimensions and performance requirements
试卷相关题目
- 1a legally binding document offered unilaterally is a ( ) .
A.purchase order
B.scope of work description
C.contract stipulation
D.level of effort proposal
E.request for proposal
开始考试点击查看答案 - 2which of the following fall(s) under the responsibilities of a project manager、
A.labor relations with project personnel
B.affirmative action
C.personnel training
D.discrimination and equal employment opportunity
E.all of the above
开始考试点击查看答案 - 3when a project manager is running over the budgeted costs, the project manager can typically ( ) to attempt to get the project back onbudget.
A.reduce features and/or functionality
B.increase risk.
C.incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)
D.all of the abov
E.E.a and b only
开始考试点击查看答案 - 4the project charter is developed by:
A.senior management
B.the customer
C.the project manager
D.both a and c
E.none of the above.
开始考试点击查看答案 - 5the best way to insure quality conformance is to ( ).
A.distribute the responsibility to subordinates.
B.maintain total control.
C.train each worker to implement the work.
D.inspect quality into the project.
E.none of the above.
开始考试点击查看答案 - 6if a project manager communicates a verbal message to a subordinate, and the subordinate leaves without saying a word, the projectmanager should assume:
A.the message was understood
B.the message was not understood
C.the subordinate discarded the information
D.the information was not appropriate
E.none of the above.
开始考试点击查看答案 - 7inspection of a complex project according to specifications is accomplished by ( ).
A.inspection by attributes.
B.cyclical inspection
C.quality conformance inspection
D.original inspection
E.none of the above.
开始考试点击查看答案 - 8the behavioral responsibilities of a project manager may also include dealing with:
A.the public
B.regulatory personnel
C.the legal environment
D.environmental issues
E.all of the above
开始考试点击查看答案 - 9the difference between the bcws and the bcwp is referred to as the:
A.schedule variance
B.cost variance.
C.estimate of completion
D.actual cost of the work performed
E.none of the above
开始考试点击查看答案 - 10"paraphrasing" is most closely associated with which part of the communication process、
A.encoding
B.decoding
C.barriers
D.feedback
E.none of the above.
开始考试点击查看答案
最新试卷
房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它