the traditional organizational form has the disadvantage of:

发布时间:2024-07-09

A.complex functional budgeting

B.poorly established communication channels

C.no single focal point for clients/sponsors

D.slow reaction capability

E.inflexible use of manpower

一对一服务

  • 报班培训

    电网、中烟、专升本
    线下培训
  • 网课学习

    各种网络课程
    学习辅导
  • 免费资料

    免费资料
    一对一辅导
  • 老师解答

    题目不会做
    一对一辅导

试卷相关题目

  • 1the methods and techniques for determining the economic costs, the environmental impact, the economic returns, and the probability forsuccess are called:

    A.feasibility studies.

    B.bills of materials.

    C.pert charts.

    D.managerial reserves.

    E.none of the above

    开始考试点击查看答案
  • 2scope management:

    A.entails managing the project's work content.

    B.is a subset of configuration management and as such is performed by cm specialists.

    C.is concerned with naming all activities performed, the end products which results and the resources consume

    D.D.is not a concern of the project manager.

    E.none of the above.

    开始考试点击查看答案
  • 3network schedules are prepared during the (    ) phase and updated during the (    ) phase.

    A.conceptual, execution.

    B.development, implementation.

    C.development, close-out.

    D.implementation, close-out.

    E.planning, finishing.

    开始考试点击查看答案
  • 4a process characteristic has a true mean of 150 and a true standard deviation of 20. a sample of 25 items is taken from this process. thestandard error of the estimate is:

    A.0.2

    B.0.8

    C.4

    D.5

    E.7.5

    开始考试点击查看答案
  • 5the planned cost for the total project at its inception is called the (    ).

    A.cost of goods sold.

    B.depreciable value.

    C.budgeted cost.

    D.B.depreciable valu

    E.C.budgeted cost.D.all of the above.E.b and c only.