You use a production order with Product Cost by Period and you entered a results analysiskey and variance key. How does the system calculate variances in Product Cost by Period、

发布时间:2024-07-09

A.Variances = Target costs - Delivery value

B.Variances = Target costs - Delivery value - WIP

C.Variances = Actual costs - Delivery value - WIP

D.Variances = Actual costs - Delivery value

试卷相关题目

  • 1How can you populate local variables in Profitability Analysis reports、(A). (B). (C). 

    A.By populating from user parameters

    B.By user exit

    C.By Business Add-In

    D.By user entry during report execution

    开始考试点击查看答案
  • 2You are implementing SAP S/4HANA and you want to run analytical reports off a single datamodel. Which statement best describes reporting in SAP S/4HANA、

    A.Reporting can be either broad and deep for analysis,or speedy and simple,but not both.

    B.Reporting on data in real time is difficult,and complex to design.

    C.Reporting on data is available in real-time at every level of detail.

    D.Reporting analytical data is always done in a business warehouse system.

    开始考试点击查看答案
  • 3You define rules in a status profile and assign the profile to your internal order type. What doyou use the status profile for、 Note: There are 3 correct answers to this question.

    A.To define the user status

    B.To define users for the order

    C.To permit or forbid specific transactions

    D.To activate the CO partner update

    E.To set the initial status as Created or Released

    开始考试点击查看答案
  • 4Which processes split costs into their primary cost components、 Note: There are 2 correctanswers to this question.

    A.Execution of the assessment cycles

    B.Business process price calculation

    C.Settlement of internal orders

    D.Cost center/activity type price calculation

    开始考试点击查看答案
  • 5You want enable WIP calculation in Product Cost by Period. What do you need to configure、

    A.Settlement profile

    B.Valuation variant

    C.Profitability Analysis (PA) transfer structure

    D.Variance variant

    开始考试点击查看答案
  • 6How can you configure the transfer price solution in SAP S/4HANA、 Note: There are 2 correctanswers to this question.(A).(B). (C). (D). 

    A.Use separate segments for each valuation.

    B.Use separate currency types within the same ledger for each valuation.

    C.Use separate ledgers for each valuation.

    D.Use separate CO versions for each valuation.

    开始考试点击查看答案
  • 7What are the prerequisites for automatic generation of the settlement rule to a market segment for a sales order item、 Note: There are 2 correct answers to this question.

    A.The sales order item is a cost object.

    B.Profitability Analysis (CO-PA) is activated.

    C.The material in the sales order item is a service.

    D.C.The material in the sales order item is a servic

    E.D.The sales order item is assigned to a project.

    开始考试点击查看答案
  • 8Which of the following statements best describe Product Cost by Period、 Note: There are 2correct answers to this question.(A). (B). (C). D). 

    A.It is used when periodic costs outweigh daily postings.

    B.It is used to analyze work in process (WIP) based on actual costs.

    C.It is used when the focus of controlling is on a stable and continuous production process.

    D.It is used in conjunction with a product cost collector.

    开始考试点击查看答案
  • 9In the material master record there are three planned prices: ""Planned price 1"", ""Plannedprice2""and""Planned price 3"". What do you use them for、

    A.To valuate goods movement

    B.To valuate the materials in cost estimates

    C.To valuate material stocks

    D.To update the standard price during the release of a standard cost estimate

    开始考试点击查看答案
  • 10You are running an indirect activity allocation. What do you post to the sender and receiver、 

    A.You post only cost to both the sender and receiver.

    B.You post quantity and cost to both the sender and receiver.

    C.You post both quantity and cost to the sender, and cost only to the receiver.

    D.You post both quantity and cost to the receiver, and cost only to the sender.

    开始考试点击查看答案
返回顶部