The Contractor shall, as specified in the Contract or as instructed by the Employer, allow appropriateopportunities for carrying out work to:
A.the Employer’s personnel
B.any other contractors employed by the Employer
C.the personnel of any legally constituted public authorities
D.the Employer’s Representative
试卷相关题目
- 1The Employer may claim the full amount of thePerformance Security when ()
A.the Contractor failed to extend the validity of the Performance Security;
B.the Contractor failed to pay the Employer an amount due, as either agreed by theContractor or determined under Sub-clause 2.5 [Employer’s Claims] or Clause 20 [Claims, Disputes and Arbitration], within 42 days after this agreement or determination,
C.the Contractor failed to remedy a default within 28 days after receiving the Employer’s notice requiring the default to be remedied,
D.circumstances which entitle the Employer to termination,
开始考试点击查看答案 - 2Employer’s Risks referred to()
A.war hostilities
B.pressure waves caused byaircraft,
C.rebellion, terrorism, revolution or usurped power or civil war, within the Country,
D.riot within the Country by the Contractor’s Personne
开始考试点击查看答案 - 3The Contract can be terminated when( )
A.the Contractor subcontracts the whole of the Works without the required agreement,
B.the Contractor want,
C.the execution of substantially all the Works in progress is prevented for a continuous period of 84 days by reason of Force Majeure,
D.the Employer substantially fails to perform his obligations under the Contract,
开始考试点击查看答案 - 4“Force Majeure” means an exceptional event or circumstance like ( )
A.which is beyond a Party’s control,
B.war, invasion, act of foreign enemies,
C.Which, having arisen, such Party could not reasonably have avoided or overcome,
D.natural catastrophes such as earthquake, hurricane, typhoon or volcanic activity.
开始考试点击查看答案 - 5The () shall appoint the Contractor’s Representative and shall give him all authority necessary to act on the Contractor’s behalf under the Contract.
A.Contractor
B.Employer
C.Engineer
D.Employer’s Representative
开始考试点击查看答案 - 6Within 42 days after the Contractor became aware of the event giving rise to the claim, the Contractor shall send to the Employer a fully detailed claim.
A.对
B.错
开始考试点击查看答案 - 7If the event or circumstance is natural catastrophes such as earthquake, hurricane, typhoon or volcanic activity, the Contractor shall be entitled to payment of any such Cost.
A.对
B.错
开始考试点击查看答案 - 8If the Employer intends to make any material change to his financial arrangements, the Employer shall give notice to the Contractor with detailed particulars.
A.对
B.错
开始考试点击查看答案 - 9The Engineer shall be responsible for the adequacy, stability and safety of all Site operations, of allmethods of construction and of all the Works.
A.对
B.错
开始考试点击查看答案 - 10The Employer may appoint an Employer’s Representative to act on his behalf under the Contract.
A.对
B.错
开始考试点击查看答案
最新试卷
注册安全工程师注册安全工程师安全生产事故案例分析2010年注
类别:建筑类其它注册安全工程师注册安全工程师安全生产事故案例分析2009年注
类别:建筑类其它注册安全工程师注册安全工程师安全生产事故案例分析2008年注
类别:建筑类其它注册咨询工程师注册咨询工程师项目决策分析与评价项目决策分
类别:建筑类其它注册咨询工程师注册咨询工程师项目决策分析与评价项目决策分
类别:建筑类其它注册咨询工程师注册咨询工程师项目决策分析与评价项目决策分
类别:建筑类其它注册咨询工程师注册咨询工程师项目决策分析与评价项目决策分
类别:建筑类其它注册咨询工程师注册咨询工程师项目决策分析与评价项目决策分
类别:建筑类其它注册咨询工程师注册咨询工程师项目决策分析与评价项目决策分
类别:建筑类其它注册咨询工程师注册咨询工程师项目决策分析与评价项目决策分
类别:建筑类其它