the wbs is:
A.an organization oriented family tree of the project.
B.a task oriented family tree of the project.
C.a cost centered structure of the project.
D.only required on large complex projects where separately identifiable work packages are difficult to construct.
E.none of the above.
试卷相关题目
- 1the pareto principle is a technique used to determine which quality control problems in a particular process should be corrected. which ofthe following statements best represents the philosophy employed by this principle、
A.in order to minimize financial losses from quality control problems, all problems which have a measureable cost should be corrected
B.the majority of defects are caused by a small percentage of the identifiable problems. improvement efforts should be reserved for these vitalproblems.
C.in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be correcte
D.D.generally, 80% of the quality control problems are justifiable for correction via cost-benefit analysis. the remaining 20% are not financiallyworthy of improvement efforts.
E.a and d
开始考试点击查看答案 - 2monte carlo simulation:
A.was originally developed by dr. carlo
B.is a european technique for assessing project risks
C.assumes the future risk events will occur at random according to predetermined probability distributions
D.is a technique to stimulate create risk event resolution
E.a, b and c only
开始考试点击查看答案 - 3job descriptions are examples of ( )communications.
A.upward
B.downward
C.horizontal
D.diagonal
E.none of the above
开始考试点击查看答案 - 4an example of coercive power would be:
A.demotion
B.reduction in wages
C.disciplinary layoff
D.reprimand
E.all of the above
开始考试点击查看答案 - 5a comparison of completion status to baseline is referred to as ( ).
A.earned value measurement.
B.percent complete.
C.acwp.
D.bcws
E.none of above.
开始考试点击查看答案 - 6which of the following processes allow an unsuccessful bidder to seek remedy for contract award to another bidder.
A.bid protest
B.bid review
C.award protest
D.award review
E.any of the above processes can be used
开始考试点击查看答案 - 7a project team member submits a suggestion on how to improve the corporate procurement process. this is an example of ( )communication
A.upward
B.downward
C.horizontal
D.diagonal
E.none of the above.
开始考试点击查看答案
最新试卷
房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它