the financial closeout of a project dictates that:

发布时间:2024-07-09

A.all project funds have been spent.

B.no charge numbers have been overrun.

C.no follow-on work from this client is possible.

D.no further charges can be made against the project.

E.all of the above.

试卷相关题目

  • 1the comprehensive review of a contractor's technical performance, cost performance, and delivery schedule, is referred to as:

    A.post project evaluation

    B.post contract evaluation

    C.post mortem

    D.procurement performance evaluation

    E.contractor's performance evaluation

    开始考试点击查看答案
  • 2the ability to get an individual or group to perform a given task is best described as:

    A.authority

    B.power

    C.influence

    D.leadership

    E.coerciveness

    开始考试点击查看答案
  • 3for communication to occur, there must be:

    A.two or more people involved

    B.the transmittal of information

    C.a communication process

    D.all of the above

    E.b and c only

    开始考试点击查看答案
  • 4assigning resources in an attempt to find the shortest project schedule consistent with fixed resource limits is called resource (    ).

    A.allocation.

    B.partitioning

    C.leveling

    D.quantification.

    E.none of above.

    开始考试点击查看答案
  • 5a (    ) estimate prepared from layouts, sketches and flowsheets, should be accurate within (-10, +25%).

    A.parametric

    B.definitive.

    C.budget

    D.bottom up.

    E.top down.

    开始考试点击查看答案
  • 6two sources of variation in the length of hex bolts exist. production variation and measurement error. the qc manager knows that thestandard deviation from these sources is 0.24" and 0.43" , respectively. what is the total standard deviation.

    A..10 inch.

    B..19 inch.

    C..34 inch.

    D..49 inch.

    E..67 inch.

    开始考试点击查看答案
  • 7which of the following activities can be considered as part of risk mitigation

    A.risk identification

    B.purchasing insurance

    C.assessment of outcomes

    D.assessment of probabilities

    E.c and d only

    开始考试点击查看答案
  • 8in general, attempts to smooth out period to period resources will (    ) the scheduled time and (    ) project costs.

    A.increase, decrease.

    B.increase, increase

    C.increase, increase or decrease.

    D.decrease, decreas

    E.E.decrease, increase.

    开始考试点击查看答案
  • 9risk management methodology should be adhered to in:

    A.construction projects

    B.system projects

    C.complex projects

    D.large projects

    E.all of the above.

    开始考试点击查看答案
  • 10the most common form of written project communication is

    A.publications

    B.bulletin boards

    C.reports

    D.letters and memos

    E.all of the above

    开始考试点击查看答案