位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(5.6)

herzberg identified factors which, if present, will lead to increased motivation. a typical factor would be:

发布时间:2024-07-09

A.good supervision

B.job security

C.regular promotions

D.good salary

E.a dental plan

试卷相关题目

  • 1guidelines for estimating time durations include:

    A.assuming a normal level of labor and equipment.

    B.assuming a normal work week.

    C.using consistent time units

    D.using past actual durations as guides.

    E.all or part of each of the above.

    开始考试点击查看答案
  • 2a project can best be defined as:

    A.series of non-related activities designed to accomplish single and multiple objectives.

    B.coordinated effort of related activities designed to accomplish a goal without a well-established end point.

    C.cradle-to-grave activities which must be accomplished in less than one year and consumes human and non-human resources.

    D.any undertaking with a definable time frame, well-defined objectives, and consumes both human and non-human resources with certainconstraints.

    E.all of the above.

    开始考试点击查看答案
  • 3a line manager possesses information which the project team needs, but withholds the information. the results in a(n):

    A.blindspot

    B.facade

    C.region of influence

    D.communication power base

    E.none of the above

    开始考试点击查看答案
  • 4a deficiency in characteristics that render the quality of the material/service unacceptable is usually referred to as:

    A.defective

    B.defect

    C.non-conformance

    D.poor workmanship

    E.lack of fitness for use

    开始考试点击查看答案
  • 5which of the following utility functions reflects risk-aversion:

    A.uniform

    B.increasing

    C.decreasing

    D.exponential

    E.b and d only

    开始考试点击查看答案
  • 6statistical cost estimating techniques (based upon history), are called (    ) estimates and are a (    ) approach.

    A.definitive, bottom up.

    B.analogy, top down.

    C.parametric, bottom up.

    D.parametric, top down.

    E.analogy, bottom up.

    开始考试点击查看答案
  • 7which quality management tool would be used to determine potential causes of a production problem、

    A.control chart.

    B.ishikawa diagram.

    C.scatter diagram.

    D.histogram.

    E.run chart.

    开始考试点击查看答案
  • 8affinity diagrams are used to:

    A.determine if a process is in control.

    B.determine root cause.

    C.show the relationship among variables.

    D.categorize large amounts of data.

    E.none of the above.

    开始考试点击查看答案
  • 9one of your project team members has made a technological breakthrough on an r & d project. the result will be new business for thecompany, as well as a company patent. the team member received a company bonus. the motivational strategy used here is:

    A.job enrichment

    B.linking pay and performance

    C.behavior modification

    D.freedom in the work place

    E.all of the above

    开始考试点击查看答案
  • 10smoothing out resource requirements from period to period is called resource (    ).

    A.allocation.

    B.partitioning

    C.leveling.

    D.quantification

    E.none of above.

    开始考试点击查看答案