a line manager possesses information which the project team needs, but withholds the information. the results in a(n):

发布时间:2024-07-09

A.blindspot

B.facade

C.region of influence

D.communication power base

E.none of the above

试卷相关题目

  • 1a deficiency in characteristics that render the quality of the material/service unacceptable is usually referred to as:

    A.defective

    B.defect

    C.non-conformance

    D.poor workmanship

    E.lack of fitness for use

    开始考试点击查看答案
  • 2which of the following utility functions reflects risk-aversion:

    A.uniform

    B.increasing

    C.decreasing

    D.exponential

    E.b and d only

    开始考试点击查看答案
  • 3which of the following networking methods allows us to show that the last 10% of one element cannot be completed until 62% of a previouselement has been completed、

    A.pert

    B.adm

    C.pdm

    D.all of the abov

    E.E.a and c only.

    开始考试点击查看答案
  • 4which of the following is not an input to quality planning、

    A.scope statement.

    B.regulations.

    C.work results.

    D.standards.

    E.quality policy.

    开始考试点击查看答案
  • 5the project scope/charter baseline includes:

    A.summary of background conditions defining the project.

    B.organization, authority and responsibility relationships.

    C.functions to be performe

    D.D.resource requirement schedule including time estimates.

    E.all of the above.

    开始考试点击查看答案
  • 6a project can best be defined as:

    A.series of non-related activities designed to accomplish single and multiple objectives.

    B.coordinated effort of related activities designed to accomplish a goal without a well-established end point.

    C.cradle-to-grave activities which must be accomplished in less than one year and consumes human and non-human resources.

    D.any undertaking with a definable time frame, well-defined objectives, and consumes both human and non-human resources with certainconstraints.

    E.all of the above.

    开始考试点击查看答案
  • 7guidelines for estimating time durations include:

    A.assuming a normal level of labor and equipment.

    B.assuming a normal work week.

    C.using consistent time units

    D.using past actual durations as guides.

    E.all or part of each of the above.

    开始考试点击查看答案
  • 8herzberg identified factors which, if present, will lead to increased motivation. a typical factor would be:

    A.good supervision

    B.job security

    C.regular promotions

    D.good salary

    E.a dental plan

    开始考试点击查看答案
  • 9statistical cost estimating techniques (based upon history), are called (    ) estimates and are a (    ) approach.

    A.definitive, bottom up.

    B.analogy, top down.

    C.parametric, bottom up.

    D.parametric, top down.

    E.analogy, bottom up.

    开始考试点击查看答案
  • 10which quality management tool would be used to determine potential causes of a production problem、

    A.control chart.

    B.ishikawa diagram.

    C.scatter diagram.

    D.histogram.

    E.run chart.

    开始考试点击查看答案