位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(25,26)

The purpose of configuration management is to:

发布时间:2024-07-09

A.insure drawings are updated

B.control change throughout the project

C.control change during the production only

D.generate engineering change proposals

E.inform the project manager of changes

试卷相关题目

  • 1Selection criteria for project selection include:

    A.cost versus benefit

    B.risk

    C.contribution towards organizational goals

    D.rate of return

    E.All of the above.

    开始考试点击查看答案
  • 2Graphical displays of accumulated cost and labor hours, plotted as a function of time, are called:

    A.Variance reports

    B.S curves

    C.Trend analysis

    D.Earned value reporting

    E.Baseline control

    开始考试点击查看答案
  • 3Going from Level 2 to Level 4 in the work breakdown structure will result in

    A.Less estimating accuracy

    B.Better control of the project

    C.Lower status reporting costs

    D.A greater likelihood that something will fall through the cracks

    E.None of the above

    开始考试点击查看答案
  • 4The document authorizing functional areas to charge against the project is the:

    A.Work authorization form

    B.Scope baseline

    C.Project charter

    D.Management plan

    E.Linear responsibility chart

    开始考试点击查看答案
  • 5A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:

    A.Change the scope baseline

    B.Prepare a variance report

    C.Call a meeting of the configuration control board

    D.Change the project's objectives

    E.Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline

    开始考试点击查看答案
  • 6A work breakdown structure is most useful for:

    A.identifying individual tasks for a project

    B.scheduling the start of tasks

    C.developing a cost estimate

    D.determining potential delays

    E.A and C.

    开始考试点击查看答案
  • 7A Gantt chart is useful in determining:

    A.the level of effort for a task

    B.when a task starts and stops

    C.how tasks are related to each other

    D.who is assigned to do a task

    E.All of the above.

    开始考试点击查看答案
  • 8A technical requirement has which of the following characteristics:

    A.easy to understand

    B.a communication tool between the user and the design team

    C.written in non-technical language

    D.developed in cooperation with the user

    E.typically describe physical dimensions and performance requirements

    开始考试点击查看答案
  • 9The project charter is developed by:

    A.senior management

    B.the customer

    C.the project manager

    D.both A and C

    E.None of the above.

    开始考试点击查看答案
  • 10A program is characterized as:

    A.a grouping or related tasks lasting one year or less.

    B.a unique undertaking having a definite time period.

    C.a grouping of similar projects having no definite end that supports the product(s) from cradle to grave.

    D.C.a grouping of similar projects having no definite end that supports the product(s) from cradle to grav

    E.D.a project with a cost over $1 million.E.None of the above.

    开始考试点击查看答案
返回顶部