during which phase of the project life cycle is the amount at stake lowest、

发布时间:2024-07-09

A.concept

B.development

C.execution

D.conclusion

E.c and d

试卷相关题目

  • 1creation of project objectives:

    A.allows for data collection and analysis and progress reporting against which standards of performance can be measured.

    B.is accomplished by selection of measurable variables against which performance can be judged.

    C.is required before funding of the project by the project sponsor.

    D.B.is accomplished by selection of measurable variables against which performance can be judged.C.is required before funding of the project by the project sponsor.D.all of the abov

    E.E.a and b only

    开始考试点击查看答案
  • 2you must produce 27 widgets. you can only produce 9 widgets per production run. each production line setup costs $1000. each widget consumes $10 worth of material and $5 worth of labor. what is total variable cost for producing one widget.

    A.1020

    B.1010

    C.1015

    D.20

    E.none of the above

    开始考试点击查看答案
  • 3techniques that can improve communication include:

    A.establishing a single, one-way communications channel

    B.avoiding face-to-face communication

    C.using redundancy (i.e. saying it two different ways) whenever possible

    D.disregarding the sensitivity of your receiver

    E.all of the above.

    开始考试点击查看答案
  • 4the delphi method is well-suited for:

    A.decision-making

    B.forecasting

    C.overhead rate estimating

    D.all of the above

    E.a and b only

    开始考试点击查看答案
  • 5the zero defects concept

    A.is a performance standard for management

    B.is a motivational technique that promotes "doing it right the first time".

    C.is used by management to communicate to all employees that everyone should do things right the first time.

    D.a and c.

    E.b and c

    开始考试点击查看答案
  • 6what tool have project managers come to use to identify all of the costs associated with a project.

    A.a bill of materials

    B.a gantt chart

    C.an arrow diagram network.

    D.a work breakdown structur

    E.E.b and c only.

    开始考试点击查看答案
  • 7(    ) is a receipt issued by a carrier for merchandise to be delivered to a party at some destination.

    A.proforma invoice

    B.inspection certificate

    C.packing list

    D.bill of lading

    E.none of the above.