- 1Work packages are used to:
A.Represent units of work at a level where work is performed.
B.Clearly distinguish one work package from all others assigned to a single functional group.
C.Limit the work to be performed to relatively short periods of time.
D.B.Clearly distinguish one work package from all others assigned to a single functional group.C.Limit the work to be performed to relatively short periods of tim
E.D.All of the above.E.A and b only
开始考试练习点击查看答案 - 2Project life cycles are very useful for ( ) and ( ) .
A.Configuration management, termination
B.Objective setting, information gathering
C.Standardization, control
D.Configuration management, weekly status updates
E.Approval, termination
开始考试练习点击查看答案 - 3Which of the following are included as part of a scope statement、
A.Project justification
B.Project deliverables
C.Project objectives
D.All of the above
E.B and C.
开始考试练习点击查看答案 - 4The initial document that formally recognizes the existence of a project is the ( ) .
A.Scope baseline
B.Management plan
C.Project charter
D.Configuration control report
E.None of the above
开始考试练习点击查看答案 - 5Which of the following is not a scope management process、
A.Initiation
B.Scope planning
C.Scope Definition
D.Scope change control
E.Scope verification
开始考试练习点击查看答案 - 6In which of the following scope management processes is the scope management plan prepared、
A.Initiation
B.Scope planning
C.Scope Definition
D.Scope change control
E.Scope verification
开始考试练习点击查看答案 - 7The project charter is prepared in which scope management process、
A.Initiation
B.Scope planning
C.Scope Definition
D.Scope change control
E.Scope verification
开始考试练习点击查看答案 - 8The work breakdown structure (WBS) is first developed in which scope management process、
A.Initiation
B.Scope planning
C.Scope change control
D.Scope Definition
E.Scope verification
开始考试练习点击查看答案 - 9In which of the following scope management processes are subject matter experts used、
A.Initiation
B.Scope planning
C.Scope Definition
D.Scope change control
E.Scope verification
开始考试练习点击查看答案 - 10A Work Berakdown Structure is most useful for:
A.Identifying individual tasks for a project.
B.Scheduling the start of tasks.
C.Developing a cost estimate.
D.Determining potential delays.
E.A and C.
开始考试练习点击查看答案
最新试卷
高中教育高考语文(重庆卷)2013年普通高等学校招生全国统一考试
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题9
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题8
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题6
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题4
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题3
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题2
类别:学历类其它高中教育高考语文高考语文第一轮复习测试题1
类别:学历类其它高中教育高考语文高中语文课课练(5)
类别:学历类其它高中教育高考语文高中语文总复习 经典易错题会诊与命题角度
类别:学历类其它