位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(23,24)

手机扫码关注微信
随时随地刷题

项目管理师PMP美国项目管理PMPPMP认证考试练习题(23,24)

推荐等级:
  • 卷面总分:0分
  • 试卷类型:模拟试题
  • 测试费用:¥5.00
  • 试卷答案:
  • 练习次数:0
  • 作答时间:0分钟

试卷介绍

试卷预览

  • 1Work packages are used to:

    A.Represent units of work at a level where work is performed.

    B.Clearly distinguish one work package from all others assigned to a single functional group.

    C.Limit the work to be performed to relatively short periods of time.

    D.B.Clearly distinguish one work package from all others assigned to a single functional group.C.Limit the work to be performed to relatively short periods of tim

    E.D.All of the above.E.A and b only

    开始考试练习点击查看答案
  • 2Project life cycles are very useful for (    ) and (    ) .

    A.Configuration management, termination

    B.Objective setting, information gathering

    C.Standardization, control

    D.Configuration management, weekly status updates

    E.Approval, termination

    开始考试练习点击查看答案
  • 3Which of the following are included as part of a scope statement、

    A.Project justification

    B.Project deliverables

    C.Project objectives

    D.All of the above

    E.B and C.

    开始考试练习点击查看答案
  • 4The initial document that formally recognizes the existence of a project is the (    ) .

    A.Scope baseline

    B.Management plan

    C.Project charter

    D.Configuration control report

    E.None of the above

    开始考试练习点击查看答案
  • 5Which of the following is not a scope management process、

    A.Initiation

    B.Scope planning

    C.Scope Definition

    D.Scope change control

    E.Scope verification

    开始考试练习点击查看答案
  • 6In which of the following scope management processes is the scope management plan prepared、

    A.Initiation

    B.Scope planning

    C.Scope Definition

    D.Scope change control

    E.Scope verification

    开始考试练习点击查看答案
  • 7The project charter is prepared in which scope management process、

    A.Initiation

    B.Scope planning

    C.Scope Definition

    D.Scope change control

    E.Scope verification

    开始考试练习点击查看答案
  • 8The work breakdown structure (WBS) is first developed in which scope management process、

    A.Initiation

    B.Scope planning

    C.Scope change control

    D.Scope Definition

    E.Scope verification

    开始考试练习点击查看答案
  • 9In which of the following scope management processes are subject matter experts used、

    A.Initiation

    B.Scope planning

    C.Scope Definition

    D.Scope change control

    E.Scope verification

    开始考试练习点击查看答案
  • 10A Work Berakdown Structure is most useful for:

    A.Identifying individual tasks for a project.

    B.Scheduling the start of tasks.

    C.Developing a cost estimate.

    D.Determining potential delays.

    E.A and C.

    开始考试练习点击查看答案
 1/4    1 2 3 4 下一页 尾页
返回顶部