the work breakdown structure (wbs) is an excellent tool for objective control and evaluation. which of the following is generally notvalidated through the wbs、

发布时间:2024-07-09

A.time, schedule and cost.

B.management coordination and organization structuring.

C.work methods and accountability.

D.quality of work.

E.risk and impact decision-making.

一对一服务

  • 报班培训

    电网、中烟、专升本
    线下培训
  • 网课学习

    各种网络课程
    学习辅导
  • 免费资料

    免费资料
    一对一辅导
  • 老师解答

    题目不会做
    一对一辅导

试卷相关题目

  • 1selective perception is (    ) of new conflicting information that may result, in a breakdown in communication.

    A.encoding

    B.blocking out

    C.transmission

    D.acceptance

    E.decoding

    开始考试点击查看答案
  • 2project cash reserves are often used for adjustment in escalation factors which may be beyond the control of the project manager. other than possibly financing (interest) costs and taxes, the three most common escalation factors involve changes in:

    A.overhead rates, labor rates and material costs.

    B.overhead rates, schedule slippages, and rework.

    C.rework, cost-of-living adjustments, and overtime.

    D.material costs, shipping cost, and scope changes.

    E.labor rates, material costs, and cost reporting.

    开始考试点击查看答案
  • 3for a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". the total standard deviation for thischaracteristic is:

    A.1.4"

    B.1.2".

    C.1.0"

    D.0.8"

    E.0.2"

    开始考试点击查看答案
  • 4activities with zero time duration are referred to as:

    A.critical path activites.

    B.noncritical path activities.

    C.slack time activities.

    D.dummies

    E.none of above.

    开始考试点击查看答案
  • 5to calculate the expected value of an outcome:

    A.divide the value of each outcome by its probability, then add the results.

    B.divide the value of the desired outcome by the value all possible outcomes

    C.multiply the value of each outcome by its probability, then add the results

    D.use linear regression to assess the expected value of the outcome

    E.b and d only

    开始考试点击查看答案
  • 6when working in an environment that uses learning curves, the most effective plan for creating the perception that pay is related toperformance is to provide the team members with an individual salary plus bonus based upon

    A.individual productivity

    B.cost effectiveness

    C.group or team productivity

    D.rating system developed by the project manager

    E.all of the above

    开始考试点击查看答案
  • 7which of the following is not part of the acquisition process:

    A.source selection

    B.invitation to bid

    C.contract award

    D.notice to proceed

    E.all of the above are parts of the acquisition process.

    开始考试点击查看答案
  • 8an individual who is working on the satisfaction of physiological needs has essentially satisfied which needs、

    A.safety

    B.empowerment/authority

    C.esteem

    D.self-actualization

    E.none of the above

    开始考试点击查看答案
  • 9in the pdm, common constraints include:

    A.start-to-start

    B.finish-to-start

    C.finish-to-finish

    D.b and c only

    E.a, b, and c

    开始考试点击查看答案
  • 10scope reporting is the timely determination, (    ), and (    ) of project progress, status data, and transforming this into structureddocumentation (reports) necessary to judge project performance (reporting on work packages).

    A.recording, accumulation.

    B.recording, graphical display.

    C.accumulation, graphical display.

    D.graphical display, interpretation.

    E.interpretation, analysis.

    开始考试点击查看答案