A line manager provides you with three estimates for his activity in your PERT network. His estimates are 2 weeks optimistically, 4 weeks most likely, and 12 weeks pessimistically. The expected time which would appear on the chart would be:
A.4 weeks
B.5 weeks
C.6 weeks
D.7 weeks
E.None of the above.
试卷相关题目
- 1Increasing resources on the critical path activities may not always shorten the length of the project because:
A.Certain activities are time-dependent rather than resource-dependent (i.e., using three ovens rather than one to bake a cake).
B.Safety, OSHA and EPA may have placed restrictions on the number of people used on certain activities or in the physical location of the project.
C.The skill level of the added resources might not be appropriate for the activities to be performe
D.D.Adding more resources may create additional work and produce inefficiencies (i.
E., additional people may need training and supervision.)E.All of the above.
开始考试点击查看答案 - 2Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:
A.The project manager and project office personnel.
B.The project team and functional managers.
C.The project sponsor.
D.All of the abov
E.E.A and B.only.
开始考试点击查看答案 - 3Network schedules are prepared during the ( ) phase and updated during the ( ) phase.
A.Conceptual, execution.
B.Development, implementation.
C.Development, close-out.
D.Implementation, close-out.
E.Planning, finishing.
开始考试点击查看答案 - 4During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:
A.Now becomes the new schedule, including the changes, and the original baseline is disregarded.
B.Is still the original baseline but annotated to reflect that a change has taken place.
C.Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
D.B.Is still the original baseline but annotated to reflect that a change has taken plac
E.C.Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.D.Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)E.Is the same since baseline schedules cannot change once the development phase is completed.
开始考试点击查看答案 - 5Your team has prepared a CPM schedule for your review. You notice that one node has six inputs (including two dummy activities) and four outputs (which include one dummy activity). Select the correct statement from the following:
A.This is a valid representation if the logic is correct.
B.This is invalid because a node can have a maximum of one dummy input representation if the logic is correct.
C.This is invalid because nodes cannot have both dummy inputs and dummy outputs.
D.This is a invalid because the number of outputs must equal the number of inputs.
E.This is invalid because a maximum of two inputs and two outputs are allowed using the critical path method.
开始考试点击查看答案 - 6Management has decided to "crash" a project in order to avoid penalty payments for late deliveries. To crash the project, either overtime or additional resources should be assigned to:
A.All activities.
B.Only those activities with the longest time durations.
C.Those activities on the critical path begining with the longest time duration activities.
D.Those activities with the greatest degree of risk.
E.None of the above.
开始考试点击查看答案 - 7A network has been developed with resources from six different departments. One of the six departments has just informed you that they can increase the number of employees from 5 to 8. This will result in:
A.A shortening of the critical path.
B.A shortening of the noncritical path.
C.A decrease in the total cost of the project.
D.An increase in the cost of the project.
E.A through D are possible based upon where the resources are deployed.
开始考试点击查看答案 - 8Bar charts are most appropriate for:
A.Comparing actual to planned performance to each activity.
B.Showing slack time.
C.Showing critical path dependencies.
D.Showing which activities can be rearranged in parallel.
E.All of the above.
开始考试点击查看答案 - 9A non-critical path activity is completed in half the time. Then,
A.The critical path is also reduced.
B.The slack in the path containing this activity will increase.
C.The total cost for this activity has decrease
D.B.The slack in the path containing this activity will increas
E.C.The total cost for this activity has decreased.D.Manpower from this activity can be assigned to other activities.E.All of the above.
开始考试点击查看答案 - 10Once the logic of a network is laid out, the project manager will conduct a forward pass and backward pass through the network. This will provide information on the ( ) and identification of the ( ) .
A.Slack for each activity, critical path.
B.Slack for each activity, high risk activities.
C.Manpower shortages, high risk activities.
D.High risk activities, non-critical paths.
E.Manpower availability, contingency plans.
开始考试点击查看答案
最新试卷
房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它