Researching, organizing and recording pertinent information is called:
A.Alternative analysis
B.Information gathering
C.Configuration management
D.Post project analysis
E.All of the above
试卷相关题目
- 1Good project objectives must be:
A.General rather than specific
B.Established without considering resource bounds
C.Realistic and attainable
D.Overly complex
E.Measurable, intangible and verifiable
开始考试点击查看答案 - 2Feasibility studies occur in which life cycle phase (s)、
A.Conceptual
B.Conceptual or Development
C.Execution
D.Preliminary planning
E.any life cycle phase
开始考试点击查看答案 - 3Scope Management:
A.entails managing the project's work content.
B.is a subset of configuration management and as such is performed by CM specialists.
C.is concerned with naming all activities performed, the end products which results and the resources consume
D.D.is not a concern of the project manager.
E.None of the above.
开始考试点击查看答案 - 4A Work Breakdown Structure:
A.assures all work is identified
B.subdivides the project into manageable segments
C.provides the project sponsor with a time-phase task summary
D.both A and B
E.All of the above.
开始考试点击查看答案 - 5The project life-cycle can be described as:
A.project concept, project planning, project execution, and project close-out.
B.project planning, work authorization, and project reporting.
C.project planning, project control, project definition, WBS development, and project termination.
D.project concept, project execution, and project reporting.
E.All of the above.
开始考试点击查看答案 - 6The Work Breakdown Structure (WBS) is the basis for communicating:
A.Project scope, cost control, schedule, quality
B.Project objectives, dependencies, plan, cost control
C.Project scope, schedule, staffing, cost control
D.Project scope, quality, schedule, dependencies
E.Project budget, schedule, risk factors, work assignments.
开始考试点击查看答案 - 7The sequential steps that define the process for successfully completing a project is:
A.Implementation Plan
B.a life cycle
C.Development Plan
D.a critical path
E.Management Plan
开始考试点击查看答案 - 8What is the purpose of the Project Plan、
A.To document the Preliminary estimates.
B.To document the Definitive estimates.
C.To document the Budgetary estimates.
D.To document Parametric estimates.
E.To document Order of Magnitude estimates.
开始考试点击查看答案 - 9Scope management is:
A.a project control function.
B.employs change control.
C.a work authorization process.
D.considers Cost, Quality and Schedul
E.E.All of the above.
开始考试点击查看答案 - 10Which percent of the total project labor hours are typically expended by the end of the second phase of the project life cycle、
A.5%
B.10%
C.15%
D.25%
E.50%
开始考试点击查看答案
最新试卷
房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2009年房地产经
类别:建筑类其它