位置:首页 > 题库频道 > 其它分类 > 计算机其它 > 专业技术高级资格信息系统项目管理师综合知识2005年5月份信息系统项目管理师上午试题

● (74)are individuals and organizations that are actively involved in the project,or whose interests may be affected as aresult of project execution or project completion;they may also exert influence over the project and its results.

发布时间:2024-07-09

A.controls

B.baselines

C.project stakeholders

D.project managers

试卷相关题目

  • 1● (73)is ameasurable,verifiable work poduct such as specification.feasibility study report,detail document,or working prototype

    A.milestone

    B.deliverable

    C.etc

    D.BAC

    开始考试点击查看答案
  • 2● The (72)technique involves using projecet characteristics in a mathematical model to predict total project cost.models can be simple or complex.

    A.cost aggregation

    B.reserve analysis

    C.parametric estimating

    D.funding limit reconciliarion

    开始考试点击查看答案
  • 3● estimating schedule activity costs involves developing an(69)of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives.for example,in mostapplication areas,additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations.the cost estimating process considers whether the expected savings can offset the cost of the additional design work.cost estmates are generally expressed in units of(70)to facilitate comparisons both within and across projects.the(71)describes important information about prject requirement that is considered duing cost estimating.

    A.accuracy

    B.approxination

    C.specification

    D.summary

    开始考试点击查看答案
  • 4● (66)is a method of constructing a project schedule network diagram that uses boxes or rectangles,referred to as nodes,to represent activites and connects them with arrows that asow the dependencies.This method includes following types of dependcies orprecedence relationships:(67)the initiation of the successor activity,depends upon the completion of the predecessor activity(68)the initiation of the successor activity,depends upon the initiation of the predecessor activity

    A.PDM

    B.CPM

    C.PERT

    D.AOA

    开始考试点击查看答案
  • 5● 关于kerberos和PKI俩种认证协议的叙述中正确的是(64),在使用kerberos认证时,首先向密钥分发中心发送初始票据(65)来请求会话票据,以便获取服务器提供的服务。

    A.kerberos 和PKI都是对称密钥

    B.kerberos和PKI都是非对称密钥

    C.kerberos是对称密钥 ,而PKI是非对称密钥

    D.kerberos是非对称密钥,而PKI是对称密钥

    开始考试点击查看答案
  • 6● (75)is the process of obtaining the stakeholdrs’formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.

    A.project acceptance

    B.scope verification

    C.scope definition

    D.WBS Creation

    开始考试点击查看答案
返回顶部