Which is the second layer from the bottom in Open System Interconnection Reference Model 、 ()
A.Application
B.Data link
C.Network
D.Session
试卷相关题目
- 1Models drawn by the system analysts during the process of the structured analysis are ()
A.PERTs
B.EMV
C.UMLs
D.DFDs
开始考试点击查看答案 - 2Which of the following is not an input to quality planning、 ()
A.scope statement
B.regulations
C.work results
D.standards
开始考试点击查看答案 - 3Performing () involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.
A.quality planning
B.quality assurance
C.quality performance
D.quality control
开始考试点击查看答案 - 4To determine whether or not the employee correctly understands the message, the project manger needs to ()
A.reduce the filtering
B.eliminate barriers
C.obtain feedback
D.use more than one medium
开始考试点击查看答案 - 5软件生存周期一般划分为六个阶段,包括软件项目计划、软件需求分析和定义、软件设计、程序编码、软件测试以及()。
A.部署实施
B.调整完善
C.运行维护
D.结项验收
开始考试点击查看答案
最新试卷
注册安全工程师注册安全工程师安全生产法及相关法律知识2018
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它注册安全工程师注册安全工程师安全生产法及相关法律知识2014
类别:建筑类其它