Fires involving combustible metals are classified as ______.
A.class 'A' fires
B.class 'B' fires
C.class 'C' fires
D.class 'D' fires
试卷相关题目
- 1A tank has been sealed and unventilated(不通风的) for a long period of time. Which of the following conditions does this indicate、
A.The tank is safe to enter.
B.The tank is especially dangerous to enter.
C.Carbon monoxide(一氧化碳) is present.
D.Water vapor present when the tank was sealed has oxidized(使氧化).
开始考试点击查看答案 - 2After the order ' ______' is given, the air system is shut down, the turning gear put in.
A.Finished With Engine
B.Stop The Engine
C.Stand-by Engine
D.Slow-down Engine
开始考试点击查看答案 - 3Bridge orders must be ______and a record of any required changes in speed and direction should be kept.
A.slowly carried away
B.carried out with a period of delay
C.promptly carried out
D.paid by the captain
开始考试点击查看答案 - 4Before “stand by” is rung on the engine telegraph, it is usual to give the main diesel engine a brief trial ______ahead and astern.
A.with power
B.on power
C.with air
D.on air
开始考试点击查看答案 - 5When there is a fire in a large electric motor, normally the very FIRST step is to ______.
A.secure the electric supply
B.ventilate area to remove smoke
C.start the fire pump and lead out hose
D.apply foam
开始考试点击查看答案 - 6The three basic components of a fire are chain reaction, heat, fuel, and ______.
A.carbon monoxide
B.oxygen
C.carbon dioxide
D.any gaseous substance
开始考试点击查看答案 - 7CO2 extinguishes a fire by __________.
A.a blanket of bubbles formed on the surface of the fire
B.smothering
C.isolating the heat from the fuel
D.cooling
开始考试点击查看答案 - 8Seawater may be used for drinking water ______.
A.at a maximum rate of two ounces(盎司) per day
B.after mixing with an equal quantity of fresh water
C.if gather during or immediately after a hard rain
D.under no circumstance
开始考试点击查看答案 - 9Obviously, for a given fuel oil, its pour point is ______its cloud point.
A.lower than
B.higher than
C.as same as
D.better than
开始考试点击查看答案 - 10Now that the valve is not worth ______, I suggest it ______.
A.to repair/renewing
B.repairing/renewing
C.to repair/ be renewed
D.repairing/be renewed
开始考试点击查看答案
最新试卷
投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2009年投资建设项
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它