Time delayed or delayed action-type fuses are designed to ______.
A.prevent grounds in branch circuits
B.prevent opens in motor circuits
C.permit momentary overloads without melting
D.guard lighting and electronic circuits
试卷相关题目
- 1A ground in an electrical circuit outside the engine room ______.
A.cannot be detected under normal conditions
B.is of no consequence to engineering personnel
C.is indicated at the branch circuit breaker panel
D.is indicated by the ground detecting lamps on the main switchboard
开始考试点击查看答案 - 2______is a machine by which electrical energy is transformed into mechanical energy.
A.An alternator
B.An electric motor
C.A diesel engine
D.A main switchboard
开始考试点击查看答案 - 3The operation of _____ two alternators requires the voltages to be equal and also in phase.
A.control
B.series-mounting
C.running
D.paralleling
开始考试点击查看答案 - 4The main generators are connected to ______.
A.distribution boards
B.section boards
C.emergency switch boards
D.main switch boards
开始考试点击查看答案 - 5Electric insulation is made of organic substances and so gradually ______with age.
A.deteriorates
B.increases
C.are fouled
D.becomes better
开始考试点击查看答案 - 6When voltage and current developed in an AC circuit reach their peak values at the same time, the power factor is ______.
A.lagging
B.leading
C.maximum
D.minimum
开始考试点击查看答案 - 7When there is a fire in a large electric motor, normally the very FIRST step is to ______.
A.secure the electric supply
B.ventilate area to remove smoke
C.start the fire pump and lead out hose
D.apply foam
开始考试点击查看答案 - 8Before “stand by” is rung on the engine telegraph, it is usual to give the main diesel engine a brief trial ______ahead and astern.
A.with power
B.on power
C.with air
D.on air
开始考试点击查看答案 - 9Bridge orders must be ______and a record of any required changes in speed and direction should be kept.
A.slowly carried away
B.carried out with a period of delay
C.promptly carried out
D.paid by the captain
开始考试点击查看答案 - 10After the order ' ______' is given, the air system is shut down, the turning gear put in.
A.Finished With Engine
B.Stop The Engine
C.Stand-by Engine
D.Slow-down Engine
开始考试点击查看答案
最新试卷
投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2009年投资建设项
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它