A firebox explosion in an automatically fired auxiliary boiler may be the result of ______.
A.excessive purging before lighting off
B.insufficient trail for ignition period
C.a faulty transformer in the ignition circuit
D.insufficient purging after lighting off
试卷相关题目
- 1The water in a steaming auxiliary boiler should be tested daily for ______.
A.dissolved oxygen
B.chlorides
C.sludge
D.dissolved nitrogen
开始考试点击查看答案 - 2______continuously extract the crankcase atmosphere, via a pipe system, and move it past a sensitive and accurate opacity (不透明)measuring track.
A.The oil mist detectors
B.The smoke detectors
C.An oily water monitor
D.Oil discharge monitoring and controlling system
开始考试点击查看答案 - 3The maximum pressure developed by a waste heat boiler is determined by the main engine exhaust ______.
A.gas composition
B.gas temperature
C.pressure
D.timing
开始考试点击查看答案 - 4A controllable pitch propeller on a diesel driven vessel eliminates the need for ______.
A.friction clutches
B.disconnect clutches
C.reversing gears
D.reduction gears
开始考试点击查看答案 - 5Before a marine diesel engine is started the cylinders and pistons must be ______.
A.cooled to appropriate temperature
B.warmed up gradually to appropriate temperature
C.opened up and renewed
D.ground and polished
开始考试点击查看答案 - 6A feed pump for an auxiliary boiler might lose suction if the ______.
A.boiler water level is low
B.feed-water is too hot
C.boiler steam demand is low
D.feed-water is too cold
开始考试点击查看答案 - 7The gear and screw pumps are classified as______.
A.variable stroke pumps
B.multistage pumps
C.positive displacement pumps
D.triple-ported pumps
开始考试点击查看答案 - 8The pressure of a liquid leaving the pump can be referred to as the ______.
A.total head
B.discharge head
C.net positive suction head
D.suction head
开始考试点击查看答案 - 9Which of the valves listed will be cycled from fully open to fully closed when the handle is turned 90 degree、
A.A rising stem gate valve
B.A globe stop valve
C.A check valve
D.A butterfly valve
开始考试点击查看答案 - 10A pump shaft that is bent or distorted should normally be ______.
A.repaired by a suitable welding process
B.straightened by applying heat and torsion
C.reconditioned by metallizing and machining
D.replaced with a satisfactory spare
开始考试点击查看答案
最新试卷
投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2010年投资项目管
类别:建筑类其它投资项目管理师投资项目管理师宏观经济政策2009年投资建设项
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它房地产经纪人房地产经纪人房地产经纪相关知识2013年房地产经
类别:建筑类其它