which of the following is referred to as payback period:

发布时间:2024-07-09

A.the number of periods required to recover the initial investment

B.the rate of return on the investment

C.the number of periods required to bring project cost back to the original budget, based on current performance

D.loan payment schedule

E.none of the above

试卷相关题目

  • 1which one of the following is not an acquisition method、

    A.advertising

    B.invitation

    C.negotiation

    D.purchase

    E.all are acquisition methods

    开始考试点击查看答案
  • 2at least (    )of the cost of quality are the direct responsibility of management.

    A.0.25

    B.0.85

    C.0.5

    D.1

    E.0.33

    开始考试点击查看答案
  • 3fast tracking means to:

    A.speed up a project through parallel tasks.

    B.swap one task for another.

    C.reduce the number of tasks if possible.

    D.b and c.

    E.none of the above.

    开始考试点击查看答案
  • 4formal written correspondence is mandated in which of the following situations:

    A.product undergoes casual in-house testing

    B.client requests additional work not covered under contract

    C.project manager calls a meeting

    D.b and c only

    E.none of the above

    开始考试点击查看答案
  • 5the delphi method is (    ) .

    A.used to derive a consensus arriving at a convergent solution

    B.useful in determining probability relating to future events.

    C.used with questionnaires based on established scenarios.

    D.continued as an iterative process until a solution is reached.

    E.all of the above.