位置:首页 > 题库频道 > 其它分类 > 资格类其它 > 项目管理师PMP美国项目管理PMPPMP认证考试练习题(19,20)

history has shown that project managers can be trained in a combination of ways. which method is usuallypreferred by most companies、

发布时间:2024-07-09

A.experiential learning, on-the-job

B.formal education and special course (degreed programs)

C.professional activities, seminars

D.individual readings

E.none of the above

试卷相关题目

  • 1the purpose of configuration management is to:

    A.insure drawings are updated

    B.control change throughout the project

    C.control change during the production only

    D.generate engineering change proposals

    E.inform the project manager of changes

    开始考试点击查看答案
  • 2three types of written media used in organizations are (    ), (    ), and (    ).

    A.manual, letters, guidelines

    B.individually-oriented, legally-oriented, organizationally oriented

    C.guidelines, forms, procedures

    D.letters, guidelines, brochures

    E.letters, contracts, policies.

    开始考试点击查看答案
  • 3which of the following is considered a direct cost for producing a widget、

    A.the cost of the materials used to produce a widget.

    B.the labor costs of the workers who actually produced the widget.

    C.the rent for the building in which the widget was manufactured

    D.the salary of senior management and the project sponsor

    E.a and b only

    开始考试点击查看答案
  • 4(    ) best describes the goal of a project in its relationship with the customer, from initial contactthrough delivery.

    A.fitness for use

    B.customer satisfaction

    C.conformance to requirements

    D.fitness for purpose

    E.all of the above.

    开始考试点击查看答案
  • 5a communicator can present information using the following media except:

    A.visual

    B.audio

    C.tactile

    D.performal

    E.both a and b

    开始考试点击查看答案