things that distort, distract, or muddle the communication process are called:

发布时间:2024-07-09

A.noise

B.selective filtering

C.selective perception

D.medium problems

E.all of the above.

试卷相关题目

  • 1which is not a consideration in a make or buy decision、

    A.cost factors (least cost alternatives)

    B.competitors' method of sourcing

    C.existence of sufficient administration/technical personnel

    D.political and social factors

    E.none of the above.

    开始考试点击查看答案
  • 2a work breakdown structure:

    A.assures all work is identified

    B.subdivides the project into manageable segments

    C.provides the project sponsor with a time-phase task summary

    D.both a and b

    E.all of the above.

    开始考试点击查看答案
  • 3a project manager can exchange information with the project team using which media、

    A.tactile

    B.audio

    C.olfactory

    D.visual

    E.all of the above.

    开始考试点击查看答案
  • 4during project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. the baselineschedule:

    A.now becomes the new schedule, including the changes, and the original baseline is disregarded.

    B.is still the original baseline but annotated to reflect that a change has taken place.

    C.is amended to reflect the scope change, but the original baseline is still maintained for post-project review.

    D.B.is still the original baseline but annotated to reflect that a change has taken plac

    E.C.is amended to reflect the scope change, but the original baseline is still maintained for post-project review.D.is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)E.is the same since baseline schedules cannot change once the development phase is completed.

    开始考试点击查看答案
  • 5sensitivity analysis can be used in risk analysis to:

    A.substitute for uncertainty analysis in risk quantification

    B.estimate the level of risk aversion adopted by management

    C.estimate the effect of change of one project variable on the overall project

    D.a and b

    E.all of the above.